Without a completed ADA Compliance Self-Certification, your Certificate of Occupancy is on hold, blocking your final city inspection and preventing your doors from opening. In Portland, Oregon, the Bureau of Development Services (BDS) requires this federal form, also called an ADA Title III Self-Evaluation, to verify your restaurant meets accessibility standards before granting occupancy. Key facts:
Analyzed from ADA Compliance Self-Certification
83% from one compliance interview
Manual entry or document upload required
The requirement to submit an ADA Compliance Self-Certification in Portland is mandated by federal law and local ordinance. The primary legal basis is the Americans with Disabilities Act Title III (ADA), enforced by the U.S. Department of Justice, which requires places of public accommodation—including restaurants—to be accessible. This is codified locally under the Portland City Code Title 24 – Building Regulations, specifically provisions that require certification of accessibility compliance for certain occupancy permits and plan reviews. The City of Portland Bureau of Development Services (BDS) administers this requirement, using the self-certification to verify your establishment meets the ADA Accessibility Guidelines (ADAAG) and Oregon Structural Specialty Code (OSSC) accessibility standards before final approvals.
Failing to obtain or maintain this certification creates significant legal and operational risks. Without it, you cannot obtain a final Certificate of Occupancy from the City of Portland, which means you cannot legally open for business. The practical consequences for non-compliance include:
Legal code: Americans with Disabilities Act Title III, ADA Accessibility Guidelines (ADAAG)
Recent update: As of 2026, Portland's Bureau of Development Services has integrated the self-certification checklist more directly into its electronic permitting portal, requiring digital submission for most commercial tenant improvement projects.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required because it's a 'place of public accommodation' under the ADA, serving the public and subject to Portland's Title 24 construction and access codes. |
| Bar / Nightclub | Required | Required under the ADA's Title III, as establishments serving the public must ensure accessible entrances, restrooms, and service counters. |
| Food Truck | Not Required | Typically does not file this form; accessibility for mobile vendors is governed by separate ADA guidelines for temporary structures and Oregon's vehicle licensing. |
| Coffee Shop / Café | Required | Required as a public-serving business, with specific focus on accessible counter height, seating, and restrooms per ADA Standards Chapter 9. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the exact legal name of your entity as registered with the Oregon Secretary of State (e.g., 'Portland Dining, LLC'), which must match your corporate filing documents exactly.
COMMON MISTAKE: Using a DBA or trade name instead of the official registered legal name, which causes the application to be flagged for entity verification.
Enter the 'Doing Business As' or trade name the public sees (e.g., 'The Riverfront Grill') if different from your legal name; otherwise, leave blank or write 'Same as legal name.'
COMMON MISTAKE: Leaving blank when you operate under a different DBA, causing a mismatch with your public-facing signage and other permits.
Enter the complete physical street address of your restaurant premises, as used for your Certificate of Occupancy and property tax records.
COMMON MISTAKE: Entering a mailing address, P.O. Box, or corporate office address instead of the specific physical location of the food service facility.
Enter 'Portland' if your facility is within Portland city limits; verify the official municipal boundary, as some postal addresses may use 'Portland' for unincorporated Multnomah County areas.
COMMON MISTAKE: Using a nearby town name (like 'Milwaukie') or an unincorporated county designation that does not match Portland's jurisdiction.
Enter the two-letter postal abbreviation 'OR' for Oregon; do not spell out 'Oregon' unless the form specifically requests the full state name.
COMMON MISTAKE: Entering 'Oregon' in full when the form's automated system is coded to expect the two-letter abbreviation 'OR'.
Enter the 5-digit ZIP Code for your physical location; include the ZIP+4 extension only if a separate field is provided.
COMMON MISTAKE: Using the ZIP Code for a business mailing address or headquarters instead of the physical restaurant location's ZIP Code.
Enter the full name of the person authorized to receive official correspondence and answer technical questions about the ADA self-certification.
COMMON MISTAKE: Listing a generic title like 'Manager' instead of a specific individual's name, which delays communication if the city needs to clarify application details.
Enter the official job title or role of the primary contact (e.g., 'Owner', 'General Manager', 'Facilities Director').
COMMON MISTAKE: Leaving blank or entering informal titles like 'The Boss,' which can appear unprofessional and may be questioned during review.
Enter a direct or main business phone number where the contact can be reached during standard city business hours (8 AM–5 PM, Monday–Friday).
COMMON MISTAKE: Providing a personal cell phone without voicemail set up or a number that is frequently unavailable, causing important follow-up calls to go unanswered.
Enter a professional, monitored business email address that will be used for all electronic correspondence and status updates from the Bureau of Development Services.
COMMON MISTAKE: Using a personal email (e.g., Gmail, Yahoo) that may filter official city emails as spam or that is not checked regularly, missing critical deadlines.
ApronPrep auto-fills 45 of 54 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Simply stating you'll 'make the space accessible' without a detailed, phased plan is the top reason for rejection. The City of Portland Bureau of Development Services (BDS) requires specific descriptions of physical modifications (e.g., 'install a 36-inch wide door with lever hardware on the main entry, remove a 6-inch threshold, and re-slope the front walkway to a maximum 1:12 ratio'). A vague plan triggers a request for information, adding 2–3 weeks to your review timeline. Avoid this by mapping out each barrier from your self-evaluation and listing the exact ADA Standard (e.g., ADAAG 404.2.4) each fix addresses.
Under Portland City Code Title 33.258, your 'path of travel' obligation is often miscalculated. This isn't just the front door to the service counter; it includes restrooms, dining areas, and any altered primary function areas. A common mistake is only budgeting for the entrance, leading to an underfunded plan that BDS will reject. This error forces you to re-file financial documentation, causing significant delays. To avoid it, work from a floor plan and identify all primary function areas accessible to the public that connect to the altered space.
The '20% rule' for disproportionality is based on the total cost of the *overall alteration project*, not just the ADA work. Owners often list only the cost of ramps or doors, which inflates the ADA percentage and incorrectly suggests the improvements are 'disproportionate.' For example, if your total remodel is $100,000 and ADA fixes are $15,000, that's 15% (not disproportionate). Stating the ADA cost alone as the project total is a clerical error that requires a formal correction and re-submission. Always provide the full, documented project budget.
ApronPrep auto-fills 45 of 54 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Eugene | ||
| Portland | ||
| Salem |
Hire a licensed architect or qualified access specialist to survey your premises against the ADA Standards and Oregon Structural Specialty Code. This step involves creating detailed floor plans highlighting routes, door widths, ramp slopes, and restroom fixtures, as well as a written assessment. You'll need your full lease agreement and building plans. This is the most time-intensive phase and common delays come from incomplete existing documentation.
Fill out Portland's official Accessibility Compliance Checklist form, attach the professional assessment report, annotated plans, and a completed State of Oregon Accessibility Certificate (if required for your project type). You must sign the affidavit of compliance. Gather your City of Portland Business License number and property tax account ID. Applications are most often rejected for unsigned affidavits or missing the seal of the reviewing professional.
File your complete packet with the Portland Bureau of Development Services (BDS). Submissions are typically made through the Portland Online Permitting (PortlandOPS) portal or in person at the Development Services Center. You must pay the plan review fee (a government filing fee) at submission, which varies by project scope. Ensure you receive a confirmation receipt with an application/permit number for tracking.
This is one of 13 requirements for opening a restaurant in Oregon.
local
federal
state
local
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing time varies significantly depending on the scope of your project. According to Portland’s Bureau of Development Services (BDS), a basic self-certification for a tenant improvement with no barriers can be processed within 2-3 weeks. For new construction or major renovations requiring a full plan review, the process can extend to 8-12 weeks, as it may be bundled with your Building Permit review. Always check the BDS project portal for current review timelines.
There is no direct government filing fee for submitting the ADA compliance self-certification form. However, associated plan review and inspection fees for the underlying construction project do apply. The total cost is typically rolled into your building permit fees, which vary based on project valuation. Contact the Portland Bureau of Development Services (BDS) for the specific fee schedule for your project.
No, a self-certification is specific to the physical location and scope of work described in the application. If you move your business, you must submit a new self-certification for the new premises. This is required because accessibility features like ramp slopes, door widths, and restroom layouts are tied to the specific building's design. Starting a new location also requires a separate City Business License/Registration.
There is no periodic renewal. The certification is a one-time attestation that your construction plans or existing facility comply with the Americans with Disabilities Act (ADA) Standards at the time of submission. However, if you undertake significant renovations or a change of use that triggers a new building permit, you will need to complete a new self-certification for that project.
A city inspector will verify that the constructed elements match the certified plans and comply with ADA standards. Key checkpoints include door clearance (minimum 32 inches), ramp slope (maximum 1:12), accessible route width, and restroom fixture heights and clearances. Failure to pass can halt your project; you must correct violations and schedule a re-inspection, which delays your final Certificate of Occupancy. Not legal advice — verify inspection details with Portland BDS.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Oregon specifically, we have analyzed compliance dossiers for 3 cities (Eugene, Portland, Salem), generating Rich FILs (Form Intelligence Layers) with 54 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.