You cannot legally begin construction or renovation on your Memphis restaurant without a Building Permit. Your project will be halted by city inspectors, risking stop-work orders, fines, and delays that can deray your opening. This permit, also called a construction or building code permit, is issued by the City of Memphis Code Enforcement - Construction Code Enforcement Division after your plans are reviewed for compliance. Key facts:
Analyzed from Building Permit
0% from one compliance interview
Manual entry or document upload required
In Memphis, construction work is regulated under the Tennessee Building Code (adopted by the state) and administered locally by the Memphis & Shelby County Construction Code Enforcement Office. This authority enforces Chapter 4 of the Memphis Code of Ordinances, which mandates permits for most construction, alteration, or repair work. The code applies to structural changes, electrical, plumbing, and mechanical systems, and is designed to ensure compliance with life safety, structural integrity, and accessibility standards (like the Tennessee Accessibility Code). Without this permit on file, the city has no official record of your project’s compliance, which prevents any final inspections or issuance of a Certificate of Occupancy.
Starting work without a permit or failing to obtain final inspections triggers immediate enforcement actions. The most common consequences include:
Legal code: State building code (locally administered), local building ordinances, state accessibility code
Recent update: In 2025, Memphis & Shelby County fully integrated its electronic plan review and permitting portal, eTRAKiT, making it the mandatory submission method for most commercial projects to reduce in-person filings.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required under the Memphis Construction Code for any new construction, alteration, or interior build-out, including dining areas, kitchens, and restrooms. |
| Bar / Nightclub | Required | Required for any structural work, occupancy changes, or installation of new plumbing/mechanical systems as per the City of Memphis Building Code. |
| Food Truck | Not Required | Typically exempt for the mobile unit itself, but a separate permit is required for any permanent utility connections, foundations, or canopies on-site. |
| Coffee Shop / Café | Required | Required for tenant improvements, electrical upgrades for equipment, and plumbing for sinks or bathrooms, per Memphis zoning and building regulations. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Underestimating the total construction cost to try and lower permit fees. The Memphis Construction Code Enforcement Division calculates fees based on the valuation you declare. If their inspectors determine your valuation is unreasonably low, they will reject the application or recalculate fees, adding 2–3 weeks for a required review and amendment. Base your valuation on current local square-foot construction costs or contractor bids, not a guess.
Submitting conceptual sketches or drawings without a professional architect's or engineer's stamp (seal). Memphis requires signed and sealed drawings by a Tennessee-licensed design professional for all structural, electrical, plumbing, and mechanical work. Applications with unsealed plans are rejected immediately. Ensure your design professional's seal, signature, and date are on every relevant sheet before submission.
The applicant (often a contractor) signs the permit application but the section for property owner authorization is left blank or not notarized when required. For any work not performed by the legal owner, Memphis requires the owner's notarized signature authorizing the agent. This omission causes a full-stop rejection. Verify if your project type requires notarization and have the owner sign in front of a notary before you file.
ApronPrep auto-fills 0 of 0 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Knoxville | ||
| Memphis | ||
| Nashville | Contact Nashville Codes and Building Safety Department for specific permit fee schedule | Timeframe not specified on page; contact department for processing times |
Memphis requires architectural or engineering plans for most commercial projects. Hire a Tennessee-licensed architect or engineer to create construction drawings, including structural, mechanical, electrical, and plumbing details. Your designer will also need to calculate the building permit fee, based on the project's total valuation, using the Memphis Construction Fee Schedule. Missing a required professional stamp is an automatic rejection and sends your application back to square one.
File your completed application (typically the IBC Building Permit Application) along with four sets of signed, sealed plans at the Office of Construction Code Enforcement (OCCE) Development Services Center. You must provide the project valuation for fee calculation and the contractor's license information. The intake clerk will perform a quick check for completeness; incomplete submittals are not accepted for review, which causes significant delays. Applications are submitted in person or via the Memphis ProjectDox electronic plan review portal for expedited intake.
Your plans undergo a concurrent review by multiple OCCE divisions: Building, Plumbing, Mechanical, and Electrical. Each reviewer checks for compliance with the 2018 International Building Code (IBC) and local Memphis amendments. This is the most variable phase. Expect to receive a formal "comment letter" listing corrections required for each discipline. Addressing these comments thoroughly with your design professional before resubmitting is critical to avoid multiple review cycles.
Applications are handled by your local building department in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Tennessee.
federal
local
state
state
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing times for building permits in Memphis vary significantly depending on project complexity and the current review queue for the Office of Construction Code Enforcement. For simple interior remodels, review may take 4-6 weeks, while new commercial construction often requires 8-12 weeks. Contact the Memphis Office of Construction Code Enforcement directly to confirm current timelines, as these are estimates per their application guides.
There is no standard government filing fee for the permit itself, per the City of Memphis fee schedule. Costs are calculated based on the project's estimated construction value. This fee structure means you must submit project plans for valuation to receive an invoice, and final fees can vary widely from hundreds to thousands of dollars. Not legal advice — verify specific costs with the Memphis Office of Construction Code Enforcement.
No, building permits are issued for a specific site and project and are not transferable. If you move your restaurant to a new location, you must apply for a new building permit and undergo a separate plan review and inspection process. This new application will also trigger other local requirements, such as a new Certificate of Occupancy and potentially an updated City Business License/Registration.
A building permit is not a renewable license; it authorizes a specific construction project. However, the permit expires and becomes invalid if work is not started within 180 days or is suspended for 180 days, as stated by Memphis building codes. To restart work after a permit expires, you must pay a reinstatement fee and may need to submit updated plans for review.
A Memphis Code Enforcement inspector will visit the site to verify construction complies with approved plans and the International Building Code. They check structural elements, electrical, plumbing, and mechanical work at specific stages (e.g., foundation, framing, rough-in, final). Failure to pass an inspection halts work until corrections are made and re-inspected, which can delay opening. Successful final inspection is required before you can apply for the Certificate of Occupancy needed to legally operate.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Tennessee specifically, we have analyzed compliance dossiers for 3 cities (Knoxville, Memphis, Nashville), generating Rich FILs (Form Intelligence Layers) with 0 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.