Without a Certificate of Occupancy from Metro Nashville Codes and Building Safety Department, you cannot legally operate your restaurant — your lease may be frozen, your lender won't fund, and inspectors can issue citations. The Certificate of Occupancy (also called a Use and Occupancy Permit in Nashville) confirms your building meets all health, safety, and zoning codes for food service operations.
Most applicants complete this form in under 15 minutes with ApronPrep.
Analyzed from Certificate of Occupancy
84% from one compliance interview
Manual entry or document upload required
Nashville requires a Certificate of Occupancy (CO) before any restaurant can open to the public — and before any existing space can be converted to a new use. The requirement is administered locally by the Metro Nashville Codes Administration under Tennessee's state building code framework, which each municipality enforces through its own permitting office. For restaurant buildouts and tenant improvements, Nashville also enforces compliance with the Tennessee State Accessibility Code (adopted from the ADA), meaning your CO inspection will verify accessible entrances, restroom configurations, and path-of-travel compliance — not just structural and mechanical systems. If your buildout involved any construction, electrical, plumbing, or HVAC work, every associated trade permit must pass a final inspection before the CO is issued.
Operating without a valid CO — or opening before final inspection approval — exposes your business to serious consequences. Metro Nashville Codes Administration can act quickly once a violation is identified:
Not legal advice — verify current enforcement procedures and fine schedules directly with Metro Nashville Codes Administration.
Legal code: State building code (locally administered), local building ordinances, state accessibility code
Recent update: As of 2025, Metro Nashville Codes Administration expanded its online permitting portal to allow electronic submission of final inspection requests for commercial tenant improvements, reducing the need for in-person scheduling — confirm current portal capabilities at the Metro Nashville Codes Administration website before submitting.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Any full-service restaurant occupying a commercial space in Nashville must obtain a Certificate of Occupancy from Metro Nashville Codes Administration before opening, as required under Metro Nashville Code of Ordinances § 16.04.010, which mandates a CO for any new occupancy or change of use in a commercial building. |
| Bar / Nightclub | Required | Bars and nightclubs are classified as Assembly (A-2) occupancies under the International Building Code as adopted by Metro Nashville, requiring a Certificate of Occupancy — and in many cases a separate change-of-occupancy CO — before the Tennessee ABC will issue a liquor license. |
| Food Truck | Not Required | A food truck is a mobile unit and does not occupy a fixed commercial structure, so Metro Nashville Codes Administration does not issue a Certificate of Occupancy for the vehicle itself; instead, food truck operators must obtain a Metro Public Health Department mobile food unit permit and, if operating from a commissary, that commissary facility must hold its own valid CO. |
| Coffee Shop / Café | Required | A coffee shop or café operating from a fixed commercial location in Nashville requires a Certificate of Occupancy issued by Metro Nashville Codes Administration, as any change of tenant or use in a commercial space triggers the CO requirement under Metro Code § 16.04.010. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the full legal name of your business exactly as it appears on your Tennessee Secretary of State registration or business formation documents — not your trade name or DBA.
COMMON MISTAKE: Entering a trade name or DBA (e.g., 'Joe's Diner') instead of the registered legal entity name (e.g., 'JD Hospitality LLC') will cause a mismatch with Metro Nashville's business records and trigger rejection.
Enter the full legal name of the individual designated as the primary point of contact for this application — typically the owner, managing member, or authorized agent who can receive official correspondence from Metro Nashville Codes Administration.
COMMON MISTAKE: Listing a general manager or employee who is not authorized to act on behalf of the business entity can create compliance issues if the city needs to reach the responsible party during inspection scheduling.
Enter a direct, working phone number for the primary contact in 10-digit format (e.g., 615-555-0100) — Metro Nashville Codes Administration uses this number to schedule required inspections, so it must be reachable during business hours.
COMMON MISTAKE: Entering a number that routes to a general voicemail box or a number that is no longer active will delay inspection scheduling and extend your approval timeline by weeks.
Enter a valid, monitored email address for the primary contact; Metro Nashville Codes Administration sends inspection notices, deficiency letters, and the issued Certificate of Occupancy digitally to this address.
COMMON MISTAKE: Using a generic or unmonitored email address (e.g., info@restaurantname.com) can cause you to miss critical inspection notices, resulting in missed appointments and added delays.
Enter the full physical street address of the restaurant location — including suite or unit number if applicable — exactly as it appears on your Metro Nashville building permit; this must match the permitted address on file with Codes Administration.
COMMON MISTAKE: Entering a mailing address, PO Box, or an address that differs even slightly from the permitted address (e.g., missing suite number, street abbreviation mismatch) is one of the most common causes of CO rejection in Nashville.
Describe your restaurant's operational concept and service type (e.g., 'full-service sit-down restaurant,' 'fast casual counter service,' 'food truck commissary kitchen') as this determines which specific building code requirements and use classifications apply to your space under Metro Nashville's zoning ordinance.
COMMON MISTAKE: Providing a vague description like 'restaurant' without specifying service type can cause inspectors to flag the entry for clarification, particularly if your concept involves mixed uses such as a bar, catering kitchen, or drive-through.
Enter the total number of seats in your restaurant as calculated per the approved architectural plans and the International Building Code (IBC) occupancy load calculations on file with Metro Nashville Codes Administration — do not estimate based on furniture count.
COMMON MISTAKE: Entering a seating count that differs from the occupant load listed on your approved plans is a high-frequency rejection trigger; the CO inspector will cross-reference this number against the approved permit drawings, and any discrepancy halts issuance.
Check this box only when all construction, finish work, and installations have been fully completed in accordance with the Metro Nashville-approved building plans — checking this box triggers Metro Codes to schedule the final inspection, so it must not be checked prematurely.
COMMON MISTAKE: Checking this box before all work is complete (e.g., hood suppression system not yet certified, ADA restroom fixtures not installed) will result in a failed final inspection, requiring a re-inspection fee and adding 2–4 weeks to your timeline.
Enter the anticipated date all construction will be finished and ready for final inspection, in MM/DD/YYYY format; Metro Nashville Codes Administration uses this date to queue inspection scheduling and allocate inspector availability.
COMMON MISTAKE: Entering an overly optimistic completion date and then missing it without updating the application can cause your inspection slot to be forfeited, requiring you to re-queue — contact Codes Administration promptly if your timeline shifts.
Check this box to certify that all completed construction — including layout, structural elements, mechanical systems, and finishes — conforms to the approved permit drawings on file with Metro Nashville Codes Administration; this is a legal attestation reviewed during the final inspection.
COMMON MISTAKE: Certifying a match when field changes were made during construction without an approved plan revision (e.g., relocated grease trap, modified exhaust duct routing) will result in an immediate failed inspection and may require a new permit amendment before the CO can be issued.
ApronPrep auto-fills 36 of 43 fields from a single compliance interview — no re-typing, no guessing what the government expects.
The Certificate of Occupancy cannot be issued until every required inspection — electrical, plumbing, mechanical, fire, and final building — is recorded as passed in Nashville's permit system. Applicants frequently submit the CO request while one or two inspections are still pending, which causes an automatic hold. For example, submitting before the fire marshal's final inspection is logged adds 2–4 weeks while you wait for the inspection slot and the system to update. Confirm every inspection status in Nashville's online permit portal before requesting the CO.
Nashville's Codes Administration classifies restaurant spaces under specific occupancy groups (typically Assembly A-2), and listing the wrong classification — or leaving it blank — will result in rejection and require resubmission with corrected plans. A common error is carrying over the previous tenant's occupancy classification, which may have been Mercantile (M) if the space was formerly a retail shop. Verify the correct classification under the International Building Code as adopted by Tennessee and confirm it with your permit technician before filing.
The floor plan submitted with your CO request must exactly match the approved construction drawings on file with Metro Nashville Codes — any deviation, even a relocated partition wall or added prep sink, requires an amended permit before the CO can issue. Inspectors routinely flag discrepancies between as-built conditions and permitted plans, which triggers a stop-work order and adds 3–6 weeks for plan review of the amendment. Walk the finished space against your approved drawings before scheduling your final inspection.
ApronPrep auto-fills 36 of 43 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Knoxville | Contact authority for current fees | 3-7 business days after application submission and construction completion; inspection typically occurs within 2 weeks of request |
| Memphis | Contact authority for current fees; typical Certificate of Occupancy inspection fees range from $200-$500 depending on square footage | 2-4 weeks after all inspections are scheduled and passed; may extend if violations require remediation |
| Nashville | Contact Metro Nashville Codes and Building Safety Department for current Use and Occupancy permit fees | Typically 2-4 weeks after final inspection passes, depending on completeness of application and inspection backlog |
Contact Metro Nashville Codes and Building Safety Department for current Use and Occupancy permit fees
Finish all interior construction, kitchen equipment installation, utility connections, and finishes according to the Metro Nashville building code and your approved construction plans. This is the longest phase — most restaurant buildouts take 6–12 weeks depending on scope. Ensure all work is documented with dated photos and contractor sign-offs for inspection records.
Secure individual trade permits from Metro Nashville Codes and Building Safety Department for electrical work, plumbing, HVAC, and any mechanical systems before work begins. You must have a valid building permit issued before trades can commence. Apply through Nashville.gov or visit the Codes and Building Safety Department office at 1417 James Robertson Parkway to submit permit applications.
Request inspections at three critical stages: framing/rough-in (after walls and structural work), mechanical (after plumbing, electrical, HVAC rough-in), and final (after all finishes and equipment installation). Each inspection must pass before the next phase begins — failed inspections add 1–2 weeks per deficiency. Schedule inspections through the Metro Nashville Codes and Building Safety Department portal or by phone at (615) 862-6350.
Applications are handled by your local building department in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Tennessee.
federal
local
state
state
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsThe timeline varies depending on whether your restaurant requires new construction inspection, renovation review, or use-group verification. Per the Metro Nashville Planning Department, initial inspections typically occur within 5–10 business days of application submission, but the full approval process—including any required corrections or re-inspections—can take 2–4 weeks. Contact Metro Nashville's Building and Codes Department to confirm the current processing timeline for your specific project scope.
Metro Nashville does not charge a separate government filing fee for a Certificate of Occupancy inspection or issuance. However, you may incur costs for required plan reviews, structural inspections, or expedited processing if applicable—contact Metro Nashville's Building and Codes Department for current fee details. Ensure your restaurant also holds a City Business License/Registration, which has separate fees. Not legal advice—verify all costs directly with Metro Nashville.
No—a Certificate of Occupancy is location-specific and tied to the physical address and use classification of your restaurant. If you relocate to a new space, you must obtain a new Certificate of Occupancy from Metro Nashville for that address. The new location will require its own inspection and approval process; contact Metro Nashville's Building and Codes Department to begin the application for your new premises.
In Nashville, a Certificate of Occupancy does not require periodic renewal—it remains valid indefinitely for the approved use at that location. However, if you make significant alterations to your restaurant's layout, seating capacity, or use classification, Metro Nashville may require re-inspection and a revised certificate. Additionally, you must maintain compliance with all building, fire, and health codes; failure to do so can result in revocation. Contact Metro Nashville's Building and Codes Department if you plan renovations or operational changes.
The Metro Nashville inspector will verify that your restaurant's construction, systems, and layout comply with the Nashville Building Code, fire codes, accessibility standards (including ADA Compliance Self-Certification), and health department requirements. The inspector checks occupancy limits, egress routes, fire suppression systems, plumbing, electrical systems, and proper use-group designation. If deficiencies are found, you receive a correction notice and must schedule a re-inspection; approval is issued only after all code violations are resolved.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Tennessee specifically, we have analyzed compliance dossiers for 3 cities (Knoxville, Memphis, Nashville), generating Rich FILs (Form Intelligence Layers) with 43 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.