ApronPrep logo
By ApronPrep Compliance Team|Reviewed by Sarah Chen, Food Safety Specialist|Verified April 2026
54Form Fields

Analyzed from Food Establishment Plan Review

45Auto-Filled

83% from one compliance interview

9Need Attention

Manual entry or document upload required

157+Cities Analyzed
9,849+Requirements Tracked
8,415+Forms Analyzed
433,000+Fields Classified

Why You Need a Food Establishment Plan Review

{ "why_description": "

The Food Establishment Plan Review is required in Aurora by the Kane County Health Department under the authority of the Illinois Food Service Sanitation Code (77 Ill. Adm. Code 750) and the City of Aurora Municipal Code, Chapter 14, Article IV. This legal framework mandates that the construction, remodeling, or change of use of any food service facility be approved before any work begins. The review ensures your proposed kitchen layout, equipment, plumbing, and ventilation systems are designed to meet minimum sanitary standards, preventing contamination and protecting public health. This is not an optional inspection; it is a mandated prerequisite for obtaining your final operating permit.

Submitting plans without this review, or beginning construction without approval, triggers significant and costly consequences. The Kane County Health Department can and will enforce the following penalties:

  • Fines: Administrative penalties for non-compliance can be levied per the Illinois Food Code and local ordinances. These are separate from any re-inspection fees.
  • Cease-and-desist / closure orders: The department can issue a stop-work order on your construction or a closure order on an operating facility until the violation is corrected and plans are submitted and approved.
  • Required re-inspection and plan resubmission: You may be forced to halt construction, alter completed work, and pay fees for a new review, adding weeks or months to your project timeline.
  • Insurance and lease implications: Violations can void builder's risk insurance policies if work proceeds unapproved. Furthermore, most commercial leases require you to maintain all necessary permits; failure can be grounds for default.
Failing to get this review approved upfront is one of the most common and expensive mistakes a new restaurant owner can make in Aurora.

", "recent_update_note": "As of 2026, the Kane County Health Department has emphasized electronic plan submission and a shift towards more detailed requirements for ventilation (Type I hood) specifications and grease interceptor sizing in their review checklists." }

Legal code: State food code (locally administered), local health regulations, state sanitary code

Permit suspension/revocation, closure orders, fines, required re-inspection, public posting of violations

Who Needs a Food Establishment Plan Review?

TypeRequiredNotes
Restaurant (Full-Service)RequiredRequired for all new facilities, remodels, or menu expansions under the Aurora Food Service Code § 24-31, as a full-service kitchen and seating area require a detailed review of plumbing, ventilation, and equipment layout.
Bar / NightclubRequiredRequired if the establishment prepares or handles any food beyond pre-packaged snacks, as per the Aurora Food Code definition of a 'food establishment' in § 24-2.
Food TruckRequiredRequired; all mobile food units must submit detailed commissary agreements, vehicle plumbing diagrams, and equipment specifications for plan review before a Mobile Food Establishment License is issued (Aurora Code § 24-48).
Coffee Shop / CaféRequiredRequired if any food preparation (including pastries, sandwiches, or heated items) occurs on-site, triggering the plan review requirement for kitchen equipment and sanitation under § 24-31.
12 more establishment types

See which restaurant types need this requirement — and which don't.

See Full Requirements →

Field-by-Field Guide (54 Fields)

45 of 54 auto-filled

Legal Business Name

text
Auto-filled from compliance interview

Enter the exact legal name of your business entity as registered with the Illinois Secretary of State or the IRS, which must match your Articles of Incorporation/Organization or your sole proprietorship tax filings.

COMMON MISTAKE: Using a DBA/trade name or an abbreviated version of the name instead of the formal, registered legal entity name, which can cause the application to be flagged as incomplete.

High rejection risk

DBA/Trade Name

text
Auto-filled from compliance interview

Enter the 'Doing Business As' name the public will see, if different from your legal business name; if you are operating under your legal name, you can enter 'Same as Legal Name' or leave blank if the form permits.

COMMON MISTAKE: Leaving this field blank when your business operates under a DBA, causing signage and permit name discrepancies, or incorrectly entering a DBA that is not formally registered with Kane or DuPage County.

Type of Food Establishment

select
Auto-filled from compliance interview

Select the category that precisely matches your primary food service activity from the provided dropdown (e.g., 'Full-Service Restaurant,' 'Fast Food,' 'Catering Kitchen,' 'Grocery with Prepared Foods'), as this determines specific plan review requirements.

COMMON MISTAKE: Selecting a generic or incorrect category (e.g., 'Restaurant' instead of 'Fast Food') which leads to the review being conducted against the wrong health code standards, requiring a re-submission.

High rejection risk

Federal EIN

text
Auto-filled from compliance interview

Enter your 9-digit Federal Employer Identification Number (XX-XXXXXXX) issued by the IRS, required for all businesses with employees or structured as corporations/partnerships; sole proprietors without employees may use their SSN.

COMMON MISTAKE: Entering an SSN when an EIN is required for the business structure, transposing digits, or including dashes/spaces in an incorrect format, which fails verification against IRS records.

High rejection risk

Owner Name

text
Auto-filled from compliance interview

Enter the full legal name of the individual, partner, or primary corporate officer who holds ultimate financial and legal responsibility for the business.

COMMON MISTAKE: Listing a manager or non-owner, or using a nickname instead of the legal name on government ID, which can delay background checks required for the permit.

Owner Title

text
Auto-filled from compliance interview

Enter the official title or role within the business entity (e.g., 'President,' 'Managing Member,' 'Sole Proprietor,' 'Partner'), clarifying the individual's authority.

COMMON MISTAKE: Leaving blank or entering informal terms like 'Boss' or 'CEO' for a simple LLC, which lacks the formality the city's legal review expects.

Owner Phone

text
Auto-filled from compliance interview

Provide a direct, working phone number for the owner, including area code, where they can be reached during business hours for application questions.

COMMON MISTAKE: Providing a disconnected number, a general business line with no owner access, or a number missing the area code, causing critical communication delays during the review.

Owner Email

text
Auto-filled from compliance interview

Provide a valid, regularly monitored email address for the owner to receive official correspondence, approval notices, and deficiency reports from the Aurora Public Health Division.

COMMON MISTAKE: Using an outdated or shared email that is not checked daily, or an address with typos, which risks missing time-sensitive review comments and halting the entire process.

High rejection risk

Owner is Operator

boolean
Auto-filled from compliance interview

Check 'Yes' if the day-to-day manager or operator of the food establishment is the same person listed as the owner; if not, check 'No' to trigger fields for a separate operator.

COMMON MISTAKE: Incorrectly selecting 'No' when the owner is the operator, which unnecessarily complicates the application and requires providing duplicate information for a separate operator.

Operator Name

text
Auto-filled from compliance interview

If 'Owner is Operator' is 'No,' enter the full name of the person responsible for daily operations and compliance; this person must often also hold a Food Service Manager Certification.

COMMON MISTAKE: Leaving this field blank when a separate operator is required, or listing someone who does not yet have the required Aurora-recognized manager certification, causing an automatic hold.

High rejection risk
44 more fields in this form

ApronPrep auto-fills 45 of 54 fields from a single compliance interview — no re-typing, no guessing what the government expects.

54total fields
45auto-filled
9need attention
Start Filling

Top 5 Food Establishment Plan Review Mistakes

1

1. Submitting Generic or Incomplete Floor Plans

Using generic templates or PDF sketches without all required dimensions and fixture details is the top reason for review rejection. The Aurora Fire Prevention Bureau and Public Health Division require plans that show exact equipment placement, plumbing fixtures, and three‑compartment sink specifications. For example, a plan that simply labels an area 'kitchen' without showing the 6-inch clearance between the fryer and the wall will be sent back for revision, adding 2–3 weeks to your timeline.

2

2. Incorrectly Calculating Seating Capacity and Grease Load

Entering the wrong seating count or underestimating grease‑producing equipment (like multiple fryers) triggers a deeper engineering review and can require costly upgrades to your grease interceptor. The city's Sewer Use Ordinance ties the required interceptor size directly to these inputs. Stating 25 seats when your layout fits 40, or listing one fryer when you have two, often results in a post‑approval violation notice and a $500+ retrofit fee.

3

3. Not Including All Required Supplemental Documents

Omitting the Menu, Proof of Ownership/Lease, or the Manufacturer's Specification Sheets for each piece of commercial cooking equipment causes immediate administrative rejection. Aurora specifically requires cut sheets for hoods, ovens, and refrigeration to verify NSF/UL certification. Submitting a plan review packet without the hood specs, for instance, will halt review until received, delaying your permit by 1–2 weeks.

2 more steps

See the complete step-by-step process with timelines and tips.

Start Filling

Skip the Paperwork on Your Food Establishment Plan Review

ApronPrep auto-fills 45 of 54 fields from one compliance interview.

No credit card required

Food Establishment Plan Review by City in Illinois

CityFee RangeTimeline
Aurora
Chicago
Rockford

Timeline: Food Establishment Plan Review in Aurora

1

Gather All Required Plans and Documents

Prepare your detailed scaled floor plan, equipment schedule, plumbing plan, and menu draft. You will also need a copy of your proposed lease, property ownership documents, and an application form. Missing or inaccurate plumbing diagrams showing waste lines and grease interceptor locations are the #1 cause of review delays and formal rejection, as per Aurora Public Health Department (APHD) standards.

3-5 business days
2

Submit Complete Application Packet to Aurora Public Health

File your completed application, plan sets, and all supporting documents with the Aurora Public Health Department. As of 2026, submissions are accepted via email, mail, or in-person drop-off at their office. Application fees, which are government filing fees, must be paid at this time by check or money order. Incomplete packets trigger a formal rejection notice and require full resubmission.

1 day
3

APHD Initial Administrative Review

APHD staff first verify your application for completeness and fee payment. They then assign your plans to a Registered Environmental Health Specialist (REHS) for a detailed technical evaluation. This administrative step determines if your file moves forward for review. Applications without the required seal from a licensed architect or engineer for plumbing work are typically held here.

2-5 business days
3 more steps

See the complete step-by-step process with timelines and tips.

Start Filling

Where to Apply

Applications are handled by your local board of health in each city. Select your city below for authority details, fees, and processing timeline.

Other Requirements You'll Need

This is one of 13 requirements for opening a restaurant in Illinois.

FAQ

Processing time varies significantly based on your project's complexity and the Aurora Department of Public Health's review queue. For a simple remodel, a review may take a few weeks, while a new construction or complex layout can take 4-8 weeks or more. Contact the Department of Public Health for a current estimate specific to your project scope.

The City of Aurora does not charge a separate government filing fee for the plan review itself. However, you must pay all associated permit fees before construction begins, which are calculated based on your project's valuation. A valid Building Permit is required before work starts, and its fee will be your primary cost. Not legal advice — verify current fees with the Aurora Building & Permits Division.

No, plan reviews are not transferable. A plan review is specific to the layout, equipment, and physical address submitted. If you move locations, you must submit a completely new set of architectural and equipment plans for review by the Aurora Department of Public Health, as the new space will have different plumbing, ventilation, and safety considerations.

A plan review approval itself does not expire or require renewal; it's a one-time approval for the specific construction or remodel project. However, you must maintain an active City Business License/Registration and pass routine health inspections to operate. Any subsequent renovations or changes to equipment layout require a new plan review submission.

The inspection verifies that the completed construction matches the approved plans. A health inspector will check that equipment placement, plumbing fixtures, floor/wall finishes, ventilation systems, and handwashing stations are installed exactly as submitted. Any deviations from the approved plans can result in a failed inspection, requiring costly corrections and a re-inspection fee before you can open.

About This Data

This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.

For Illinois specifically, we have analyzed compliance dossiers for 3 cities (Aurora, Chicago, Rockford), generating Rich FILs (Form Intelligence Layers) with 54 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.

Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.

157+Cities analyzed
9,849Requirements tracked
8,415Forms analyzed
433,000Fields classified
How we verify data

This Form Is One of 60+ Requirements.

ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.