Your final building or health inspection will be withheld, blocking your Certificate of Occupancy, if you cannot provide an approved Grease Trap/Interceptor Permit from the Henderson Building and Fire Safety Department (also called a grease waste control permit). This local requirement verifies your plumbing installation meets city code to prevent sewer clogs.
Analyzed from Grease Trap/Interceptor Permit
85% from one compliance interview
Manual entry or document upload required
The Grease Trap/Interceptor Permit in Henderson is required by the Henderson Municipal Code (HMC), specifically under Title 13 – Public Utilities, which governs sewer use. This ordinance, enforced by the city's Water & Sewer Utilities Department, mandates that any commercial food service establishment install and maintain a properly sized grease interceptor to prevent fats, oils, and grease (FOG) from entering the public sewer system. The primary legal basis for this permit is adherence to local discharge limits, which are designed to protect the city's wastewater infrastructure from blockages and overflows that can cause significant environmental and public health hazards.
Operating without this permit or failing to maintain your grease trap system exposes your restaurant to immediate and costly consequences. Based on enforcement actions in Henderson, the typical penalties include:
Legal code: Local sewer use regulations, water connection requirements, road/sidewalk ordinances, grease discharge limits
Recent update: As of 2026, the City of Henderson requires all new grease trap permit applications to include a certified as-built drawing from a licensed plumber, aligning with updated inspection protocols.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required per Henderson Municipal Code (HMC) § 13.16.060 and the Henderson Wastewater Sewer Use Ordinance for any establishment that discharges fats, oils, and grease (FOG) from food preparation. |
| Bar / Nightclub | Required | Typically required if food service is offered, as the kitchen discharge of FOG falls under HMC § 13.16.060; bars without food prep may be exempt, but the city usually requires verification. |
| Food Truck | Required | Required if the truck has a permanently installed onboard kitchen with a drain, as it must connect to a grease interceptor for wastewater discharge at commissaries, per Clark County Health District rules adopted by Henderson. |
| Coffee Shop / Café | Not Required | Often exempt if operations are limited to brewing beverages and serving pre-packaged foods; a permit is triggered only if the establishment conducts significant food prep (e.g., frying, grilling) that generates FOG. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the legal name of your business as registered with the Nevada Secretary of State, which must match exactly with your state-issued business license and tax records.
COMMON MISTAKE: Submitting a 'doing business as' (DBA) name here instead of the registered legal entity name, which causes the application to be flagged for a mismatch with state records.
Specify the legal structure of ownership, such as 'Corporation', 'LLC', 'Sole Proprietorship', or 'Partnership', as this determines liability and application signature authority.
COMMON MISTAKE: Using casual descriptions like 'me and my partner' instead of the formal legal term, which can delay processing as the department must verify the correct entity type.
Provide the complete street address where the grease trap/interceptor will be physically installed, which must be within Henderson city limits and match the address on your building permit.
COMMON MISTAKE: Listing a corporate office or mailing address instead of the physical installation location, leading to a failed site inspection and application rejection.
Select the specific model type, such as 'Hydromechanical Grease Interceptor (HGI)', 'Gravity Grease Interceptor (GGI)', or 'Automatic Grease Removal Unit (AGRU)', as required by Henderson Municipal Code § 13.12.040.
COMMON MISTAKE: Entering a generic term like 'grease trap' without the approved model type, which will be rejected as non-compliant with the city's approved equipment list.
Enter the liquid capacity in gallons as specified by the manufacturer's datasheet, which must be calculated based on your kitchen's estimated flow rate and fixture units.
COMMON MISTAKE: Guessing or estimating the capacity without the manufacturer's specs, resulting in an undersized unit that fails approval and requires a full re-application.
Check this box to confirm you possess and will submit the manufacturer's cut sheets, performance data, and NSF/APSA certification for the specified grease interceptor.
COMMON MISTAKE: Checking this box without actually having the documents ready for upload, causing an immediate 'incomplete application' rejection from Henderson Public Works.
List the exact title and document number of the manufacturer's specification sheet (e.g., 'Smith Industries Model GT-2000 Spec Sheet, Revision 3') that you will attach.
COMMON MISTAKE: Leaving this field blank or writing 'see attached', which triggers a manual review delay of 1–2 weeks as staff must search for the correct document.
State whether the unit will be installed 'Indoor' (e.g., in a mechanical room) or 'Outdoor' (e.g., in a parking lot vault), as this affects venting, access, and inspection requirements.
COMMON MISTAKE: Selecting 'Indoor' for a unit that will actually be outdoors, which creates a discrepancy with the site plan and leads to a failed pre-approval review.
Describe the precise installation point relative to permanent landmarks (e.g., '15 feet east of the rear kitchen door, adjacent to the dumpster enclosure') to enable inspectors to locate it.
COMMON MISTAKE: Providing vague descriptions like 'behind the building' or using temporary references like 'next to the blue truck', which are insufficient for the inspector's site visit report.
Check this box to attest that you have a scaled site plan showing the grease interceptor's location, all plumbing lines, cleanouts, and access points, as required by Henderson Public Works.
COMMON MISTAKE: Checking 'yes' without a plan that meets scale and detail requirements (1/8" = 1' scale, with utility lines), resulting in an automatic rejection and loss of the application fee.
ApronPrep auto-fills 22 of 26 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Based on ApronPrep's analysis of Grease Trap/Interceptor Permit applications submitted to the City of Henderson Utilities Department, the five most common errors cause processing delays of 10-21 business days on average.
Listing a generic tank size (e.g., '1000-gallon trap') without providing the manufacturer's model number and certified engineering calculations. The Henderson Municipal Code (HMC) § 13.20.110 requires sizing based on fixture units and flow rates. This mistake triggers a review rejection, requiring a licensed plumber or engineer to resubmit sizing documentation, adding 2-3 weeks to your timeline. Avoid it by attaching the manufacturer's specification sheet and the contractor's detailed sizing calculations to the application.
Submitting a basic floor plan instead of a detailed plumbing plan that shows the grease interceptor's exact location, all connected fixtures (sinks, dishwashers, floor drains), and all piping routes. Per the City's Technical Standards, the plan must be to scale and include a materials list. Incomplete plans are the #1 cause of immediate 'incomplete application' returns. To avoid this, ensure your plumber provides a dedicated plumbing riser diagram that clearly traces waste lines from each fixture to the interceptor.
ApronPrep auto-fills 22 of 26 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Henderson | Contact Henderson Building and Fire Safety Department for current fees | Contact authority for current processing timeframe |
| Las Vegas | ||
| Reno | Contact City of Reno Utility Services for permit and inspection fees | Varies; contact Environmental Control for specific timeline |
Contact Henderson Building and Fire Safety Department for current fees
Call or visit the Henderson Building and Fire Safety Department at 240 Water Street to obtain the current grease trap/interceptor permit application packet. You will need your restaurant's address, EIN, and project details ready. This initial call typically takes 20–30 minutes to clarify size requirements and connection specifications. A site visit to assess existing plumbing is often recommended.
Fill out Henderson's Plumbing Permit Application Form (BFS-P-01) for the grease trap. Required information includes the property address, contractor license numbers, trap capacity (in gallons), manufacturer/model, and a detailed site plan. You will need your contractor's license information, trap specifications, and a scaled drawing of the installation location. Incomplete contractor license info is the most common reason for application rejection.
Submit the completed permit application, along with two sets of detailed construction drawings (showing trap location, plumbing connections, and clean-out access) and the contractor's signed affidavit, to the Building & Fire Safety Department's permit counter. Submissions are accepted in person only. Missing or non-scaled drawings cause a 2–3 week delay for plan review resubmission.
Applications are handled by your local department of public works (dpw) in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Nevada.
federal
local
local
federal
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing timelines vary based on plan review needs and inspection scheduling. According to the Henderson Public Works Department, applicants should contact the authority directly for the current processing timeframe for new installations. Your project timeline can be impacted by required reviews for your Building Permit and Certificate of Occupancy.
The City of Henderson does not charge a specific government filing fee for the grease trap/interceptor permit itself. However, fees for required plan reviews, inspections, and associated permits like the Building Permit will apply. Contact the Henderson Public Works Department to confirm the total project costs, as they are calculated based on the scope of work.
No, grease trap/interceptor permits in Henderson are not transferable between locations. The permit is specific to the approved plumbing system and physical site. If you move your business, you must apply for a new permit at the new address, which includes new plan submissions and inspections per the city's code.
The installation permit itself is a one-time approval for construction. However, ongoing compliance is required through regular maintenance and potential re-inspection. While the permit doesn't renew annually, your Annual Business License Renewal may be contingent on maintaining all required permits in good standing.
A city inspector will verify the installed interceptor matches the approved plans, checking for proper size, location, accessibility, and connection to the sewer line. They will also ensure venting and cleanout access meet the Henderson Municipal Code. Passing this inspection is typically required before final approval of related permits, such as the Certificate of Occupancy.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Nevada specifically, we have analyzed compliance dossiers for 3 cities (Henderson, Las Vegas, Reno), generating Rich FILs (Form Intelligence Layers) with 26 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.