Your new restaurant's plumbing inspection will fail and you cannot legally connect to the city sewer without a Grease Trap/Interceptor Permit from the City of Reno Utility Services, also called a grease waste permit. Key facts:
Analyzed from Grease Trap/Interceptor Permit
85% from one compliance interview
Manual entry or document upload required
In Reno, operating a food service establishment without a grease trap/interceptor permit is a direct violation of local ordinances designed to protect the city's sewer infrastructure. The requirement stems primarily from Reno Municipal Code (RMC) Title 12, which governs public utilities, and Title 15, covering environmental protection. These codes, enforced by the City of Reno Public Works Department and the Truckee Meadows Water Reclamation Facility (TMWRF), set strict limits on Fats, Oils, and Grease (FOG) discharge into the sanitary sewer system to prevent blockages, sewer overflows, and costly damage to public and private property.
Failure to secure and comply with this permit carries significant, immediate consequences. Common penalties include:
Legal code: Local sewer use regulations, water connection requirements, road/sidewalk ordinances, grease discharge limits
Recent update: As of 2026, the City of Reno has integrated its FOG permit review process more closely with new business licensing, meaning your application may be cross-checked by multiple departments, increasing scrutiny on the accuracy and completeness of your submission.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required, as any establishment preparing food with fats, oils, or grease (FOG) and discharging into the municipal sewer system must comply with City of Reno and Truckee Meadows Water Authority (TMWA) FOG Control Program regulations. |
| Bar / Nightclub | Required | Required if the bar operates a kitchen with a 3-compartment sink, dish machine, or any other source of FOG discharge into the sewer, per Reno Municipal Code § 13.08. |
| Food Truck | Not Required | Typically not required for the mobile unit itself, as it connects to a commissary's waste system; however, the commissary kitchen you use must have a valid permit and you must provide proof of that agreement to the city. |
| Coffee Shop / Café | Required | Required, as operations involving milk steaming, espresso machine cleaning, and dishwashing generate FOG, triggering the requirement under TMWA's FOG Pretreatment Program. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the legal name of your business as it appears on your Articles of Incorporation, LLC filing, or DBA registration with Washoe County or the Nevada Secretary of State.
COMMON MISTAKE: Using a marketing name or slogan instead of the registered legal name, which will cause the application to be flagged for a business verification mismatch.
Enter your business structure (e.g., 'Corporation,' 'Limited Liability Company,' 'Sole Proprietorship,' 'Partnership') exactly as it's documented with the state.
COMMON MISTAKE: Leaving this field blank or using informal terms like 'Restaurant' instead of the formal legal structure; both errors trigger a request for documentation proof.
Enter the 9-digit Federal Employer Identification Number (EIN) issued by the IRS for your business, formatted as XX-XXXXXXX.
COMMON MISTAKE: Entering a Social Security Number for a sole proprietorship without the proper SSN/EIN designation or using dashes in the wrong format, which causes an immediate validation failure.
Enter the full legal name of the primary point of contact for this permit application, typically an owner or manager authorized to receive official correspondence.
Enter a direct phone number for the contact person, formatted as (XXX) XXX-XXXX, where they can be reached during standard business hours.
COMMON MISTAKE: Providing a main restaurant line that goes to voicemail or an unmonitored number, which can delay the inspection scheduling process.
Enter the complete street address (number, street, unit/suite) of the restaurant facility where the grease trap is or will be installed, as it appears in your lease or property deed.
COMMON MISTAKE: Entering a P.O. Box or mailing address instead of the physical location, which fails the City of Reno's site verification for the Plumbing & Mechanical Inspection Division.
Specify the type of establishment (e.g., 'Full-Service Restaurant,' 'Fast Food,' 'Cafeteria,' 'Bakery,' 'Food Truck Commissary') as defined in the Reno Municipal Code (RMC) Chapter 13.08.
COMMON MISTAKE: Using overly generic terms like 'Restaurant' or 'Food Business' instead of the specific operation type, which prevents accurate determination of required trap capacity.
Enter the total liquid holding capacity of the grease interceptor in gallons, as specified by the manufacturer's data plate or the approved plumbing plans.
COMMON MISTAKE: Entering the flow rate (GPM) or the grease storage weight (lbs) instead of the vessel's liquid capacity in gallons, a discrepancy that will fail the Plumbing Division's technical review.
Provide a professional plumber or engineer's estimate, based on fixture units and seat count, of the daily volume of fats, oils, and grease (FOG) entering the wastewater system.
COMMON MISTAKE: Guessing a round number (e.g., '10 gallons') without a calculation basis, which often results in an application hold for a certified hydraulic report.
State whether the trap is 'Proposed/Not Yet Installed,' 'Existing - To Be Modified,' or 'Existing - As Is'; this determines if you need a construction permit or just an operating permit.
COMMON MISTAKE: Selecting 'Existing - As Is' for a new installation to avoid a construction permit, which will lead to a failed initial inspection and a stop-work order.
ApronPrep auto-fills 17 of 20 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Entering a capacity based on guesswork or outdated tables instead of the required calculation per Reno Municipal Code 13.08.400 leads to automatic rejection. You must calculate the required capacity in pounds per the Environmental Control Department's formula, which considers fixture units, flow rates, and whether you have a garbage disposal. Using a generic '1,000-gallon' estimate for a full-service restaurant will fail review and require a resubmission, adding 2-3 weeks to your timeline.
Omitting fixtures or listing them generically (e.g., '3 sinks') instead of by specific type (pre-rinse, pot, hand, mop) is a top rejection reason. The Reno Environmental Control Department reviews your plumbing plan against the fixture unit count on the form; a mismatch halts processing. For example, you must separately list a 2-compartment pot sink (2 fixture units) and a pre-rinse sink (4 fixture units), not just 'kitchen sinks.' This mistake typically causes a 10-14 day delay for correction requests.
Attaching a generic floor plan instead of a dedicated, scaled plumbing diagram that traces all grease-laden wastewater sources to the interceptor location will get your application returned. The diagram must show pipe diameters, slopes, and cleanout locations as specified in the application packet. A common error is submitting an architect's floor plan that highlights sinks but doesn't show the waste line routing. This omission results in an immediate 'incomplete' status, requiring a full re-submission.
ApronPrep auto-fills 17 of 20 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Henderson | Contact Henderson Building and Fire Safety Department for current fees | Contact authority for current processing timeframe |
| Las Vegas | ||
| Reno | Contact City of Reno Utility Services for permit and inspection fees | Varies; contact Environmental Control for specific timeline |
Contact City of Reno Utility Services for permit and inspection fees
Request the Industrial Pretreatment Permit application packet from the Reno Utility Services Department, Environmental Control division. Call or email them directly; it's not available for public download online. Have your restaurant's legal name, address, and estimated gallons-per-day wastewater flow ready. This initial contact is where most delays start, so ask for the full checklist of required supporting documents.
Fill out the 10+ page application form with exact specifications: manufacturer, model, serial number, and hydraulic/flow rate of your grease interceptor(s). You'll also need your plumber's contractor license number and signature. Applications without the interceptor's certified capacity (in gallons) from the manufacturer's spec sheet are commonly rejected, adding weeks to the process. ApronPrep can auto-fill your business entity details.
Compile and submit your packet: completed application, site plan showing interceptor location, plumbing diagram, manufacturer's cut sheets, and your plumber's license. Reno Environmental Control requires hard-copy submission by mail or in-person at their office; electronic submission is not accepted as of 2026. Incomplete packets are returned via mail, which can add 10+ business days to your timeline.
Applications are handled by your local department of public works (dpw) in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Nevada.
federal
local
federal
state
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing times vary significantly and are not published by the city. According to Reno's Environmental Control Department, timelines depend on project complexity, inspection scheduling, and application volume. You must contact Environmental Control directly for a current estimate, as this is a plan review and inspection process, not a simple filing.
The City of Reno does not publish a standard government filing fee for this permit, listing the cost as $0–$0. However, fees may be assessed for related plan reviews or required Backflow Prevention Device Certification. Always verify the current fee structure with the Reno Environmental Control Department before submitting your application. Not legal advice — verify with the City of Reno.
No, grease trap permits are site-specific and cannot be transferred. The design, capacity, and installation are approved for a specific plumbing layout and location. A new application, plans, and inspection are required for any new restaurant site, similar to the process for a new Building Permit.
The permit itself does not typically expire, but ongoing compliance is mandatory. Your grease interceptor must be inspected and pumped regularly by a licensed hauler, with records kept on-site. Failure to maintain the system can trigger enforcement actions from the Environmental Control Department.
An inspector from Reno Environmental Control will verify the installation matches the approved plans, checking for proper sizing, location, accessibility, and connection to the kitchen's grease-producing fixtures. They will also confirm that the required City of Reno Environmental Control Approval process is satisfied. The inspection must be passed before the permit is finalized and the restaurant can open.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Nevada specifically, we have analyzed compliance dossiers for 3 cities (Henderson, Las Vegas, Reno), generating Rich FILs (Form Intelligence Layers) with 20 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.