ApronPrep logo
By ApronPrep Compliance Team|Reviewed by Sarah Chen, Food Safety Specialist|Verified April 2026
25Form Fields

Analyzed from Plumbing Permit

21Auto-Filled

84% from one compliance interview

4Need Attention

Manual entry or document upload required

157+Cities Analyzed
9,849+Requirements Tracked
8,415+Forms Analyzed
433,000+Fields Classified

Why You Need a Plumbing Permit

A Plumbing Permit is required in Memphis because it is the city's primary enforcement tool for the 2018 International Plumbing Code (IPC) with Tennessee amendments, which is adopted by state law and locally administered by the Memphis & Shelby County Division of Construction Code Enforcement. This legal mandate is detailed in the Tennessee Code Annotated, Title 68, Chapter 120 and enforced through the Memphis Code of Ordinances, Title 9 (Building Regulations). The permit ensures that all plumbing installations—from new grease interceptors to bathroom remodels—meet minimum standards for safety, sanitation, and water conservation before any water is turned on or walls are closed up. Without this permit, your project has no legal standing, and the work is considered unlawful from the start.

Proceeding without this permit or failing an inspection triggers immediate and costly consequences. Based on ApronPrep's analysis of Memphis enforcement actions, common penalties include:

  • Stop-Work Orders: The Building Official can post a notice on your property, halting all construction. This freezes your timeline and locks out contractors until the violation is corrected and fines are paid.
  • Monetary Fines: The city can levy daily penalties for each day the unpermitted work exists or continues. While amounts vary by case, fines often exceed the original permit cost by multiple times.
  • Certificate of Occupancy (CO) Denial (for new builds): The city will not issue a final CO if any plumbing work lacks proper permits and final inspections, meaning you cannot legally open for business.
  • Required Demolition: Inspectors can order you to open up walls or ceilings to expose non-compliant work for inspection, and may require you to remove and redo the installation entirely at your own expense.
  • Lease & Insurance Complications: Unpermitted work can void lease compliance clauses and invalidate property insurance claims related to water damage, leaving you fully liable for any failures.

Legal code: State building code (locally administered), local building ordinances, state accessibility code

Stop-work orders, fines, certificate of occupancy denial, required demolition of non-compliant work

Recent update: As of 2026, Memphis now requires all plumbing permit applications for commercial projects to be submitted through the city's online ePermits portal, eliminating paper submissions for most applicants.

Who Needs a Plumbing Permit?

TypeRequiredNotes
Restaurant (Full-Service)RequiredRequired; Memphis Code of Ordinances § 6-108 requires a permit for all plumbing work in a commercial kitchen.
Bar / NightclubRequiredRequired; plumbing permit needed for bar sink installation, glass-washer hookups, and any new restroom fixtures.
Food TruckNot RequiredNot required for the vehicle; plumbing is part of the Tennessee Department of Health mobile food unit permit and vehicle inspection.
Coffee Shop / CaféRequiredRequired; a permit is needed for installing the commercial-grade espresso machine water line and three-compartment sink.
12 more establishment types

See which restaurant types need this requirement — and which don't.

See Full Requirements →

Field-by-Field Guide (25 Fields)

21 of 25 auto-filled

Business Legal Name

text
Auto-filled from compliance interview

Enter the exact legal name of your business entity as it appears on your filed Articles of Incorporation, LLC registration, or DBA certificate with Shelby County.

COMMON MISTAKE: Using the restaurant's 'doing business as' (DBA) name instead of the registered legal entity name causes rejection because it fails to match official state/county records.

High rejection risk

Federal EIN

text
Auto-filled from compliance interview

Enter your 9-digit Employer Identification Number (EIN) issued by the IRS, formatted as XX-XXXXXXX, which is required for tax and business registration verification.

COMMON MISTAKE: Entering a Social Security Number (SSN) for a corporate entity or using an incorrect format (e.g., no dashes) triggers a review hold for identity verification.

High rejection risk

Restaurant Physical Address

text
Auto-filled from compliance interview

Enter the complete street address, including suite or unit number, of the restaurant where the plumbing work will be performed, as it appears on your lease or property deed.

COMMON MISTAKE: Providing a mailing address (e.g., P.O. Box) or the corporate office address instead of the specific job-site location leads to rejection because inspections are scheduled by physical location.

High rejection risk

Owner/Authorized Representative Name

text
Auto-filled from compliance interview

Enter the full legal name of the business owner, LLC member, or corporate officer who is legally authorized to sign contracts and permits for this project.

COMMON MISTAKE: Listing a project manager or contractor's name without written proof of authorization (like a notarized letter) results in rejection for lack of signing authority.

High rejection risk

Owner Phone Number

text
Auto-filled from compliance interview

Enter a direct, working phone number for the authorized representative listed above, formatted as (XXX) XXX-XXXX, which inspectors will use for scheduling and urgent issues.

COMMON MISTAKE: Providing a disconnected number, a generic office line with no direct contact, or an international number without a US country code causes inspection delays and administrative holds.

Owner Email Address

text
Auto-filled from compliance interview

Enter a valid, regularly monitored email address for the authorized representative to receive permit status updates, inspection results, and official correspondence from Memphis Code Enforcement.

COMMON MISTAKE: Using an incorrect or typo-filled email address (e.g., 'gmail.con') means you miss critical notifications, which can lead to permit expiration or failed inspections due to no-show.

Proof of Ownership/Authorization

text
Auto-filled from compliance interview

Describe the attached document that proves your right to perform work at this address, such as a 'Recorded Warranty Deed,' 'Lease Agreement,' or 'Authorization Letter from Property Owner.'

COMMON MISTAKE: Submitting an unsigned lease, an expired deed, or a generic business license instead of property-specific ownership proof is the #1 cause of immediate application rejection.

High rejection risk

Project Scope Description

text
Auto-filled from compliance interview

Provide a detailed, plain-English description of all plumbing work, including specific fixtures (e.g., 'install 2 new commercial pre-rinse sinks'), pipe routing, and connections to existing sewer/water lines.

COMMON MISTAKE: Using vague terms like 'plumbing remodel' or 'fix pipes' without specifics leads to rejection for insufficient detail, as reviewers cannot determine required inspections or code compliance.

High rejection risk

Number of Kitchen Sinks

text
Auto-filled from compliance interview

Enter the total count of all kitchen sinks involved in the project, including new installations, replacements, and existing sinks being modified, as this affects fixture unit calculations for drainage.

COMMON MISTAKE: Omitting existing sinks that will remain connected to the modified plumbing system causes the drainage load calculation to be incorrect, leading to a rejection for under-sized pipe plans.

High rejection risk

Kitchen Sink Specifications

text
Auto-filled from compliance interview

List the make, model, and material (e.g., 'Elkay EZH2O stainless steel, 3-compartment') for each kitchen sink, confirming it meets NSF/ANSI 61 standards for commercial food service.

COMMON MISTAKE: Listing residential-grade sink models not certified for commercial use results in rejection, as Memphis Plumbing Code § 6.04 requires all food-service fixtures to be NSF-approved.

High rejection risk
15 more fields in this form

ApronPrep auto-fills 21 of 25 fields from a single compliance interview — no re-typing, no guessing what the government expects.

25total fields
21auto-filled
4need attention
Start Filling

Top 5 Plumbing Permit Mistakes

1

1. Mistake Title: Mismatched Project Valuation

Entering the cost of only the plumbing fixtures or labor, not the total project value including all materials and installation. Memphis Inspections uses this figure to calculate the permit fee, so an incorrect valuation triggers a correction request and resets your place in the review queue, adding 7-10 business days to your timeline. Avoid this by calculating the total fair market value of all plumbing work, including pipe, fittings, fixtures, water heater, and labor, then enter that single, comprehensive amount.

2

2. Mistake Title: Incorrect Contractor License Details

Failing to provide the exact, current license number for the Master Plumber of Record or leaving the license expiration date blank. The permit system cross-references the state licensing board daily; mismatched or expired data causes an automatic administrative hold. To avoid rejection, verify the contractor's active Tennessee State Board of Licensing Contractors (TSBLIC) Master Plumber license number and expiration date directly from the state's online verification tool before you submit.

3

3. Mistake Title: Vague or Incomplete Scope of Work Description

Writing 'plumbing remodel' or 'fix bathroom' instead of a specific, itemized description like 'Replace 40-gallon electric water heater, install two new lavatory faucets, and re-route 3/4" PEX supply line to kitchen island.' Inspectors need precise details to determine required inspections; vague scopes lead to review questions and delays. Prevent this by listing every fixture, appliance, and pipe run being installed, relocated, or replaced.

2 more steps

See the complete step-by-step process with timelines and tips.

Start Filling

Skip the Paperwork on Your Plumbing Permit

ApronPrep auto-fills 21 of 25 fields from one compliance interview.

No credit card required

Plumbing Permit by City in Tennessee

CityFee RangeTimeline
KnoxvilleContact authority for current fees - Knoxville.gov does not list standard plumbing permit fees in available documentationEstimated 5-10 business days for plan review; final timeline depends on plan completeness and resubmission requirements. Schedule inspections upon permit approval.
MemphisContact authority for current fees - fees vary based on scope of plumbing workContact authority for current review timelines - varies by permit complexity and inspector availability
NashvilleContact authority for current fees7-14 business days for permit issuance after submission; inspection scheduling dependent on department workload

Government Filing Fees

Contact authority for current fees - fees vary based on scope of plumbing work

Timeline: Varies

1

Step 1: Create an online account on the City of Memphis Permit Registration and Administration Site (permitspayments.memphistn.gov)

Visit the city's permit portal and register for an individual or contractor account using your legal business name and tax ID. You’ll need a valid email and phone number for verification. The account setup takes about 10 minutes but can be delayed if your business information doesn’t match state or county records.

10–30 minutes
2

Step 2: Prepare plumbing work documentation including kitchen sink specifications and grease trap design plans that comply with state building code and local ordinances

Gather detailed plumbing diagrams showing fixture locations, pipe sizes, and drainage routes. Your grease trap plan must include capacity calculations based on your kitchen’s anticipated flow rate, per Tennessee Plumbing Code § 1003.2 and Memphis amendments. Missing or non-compliant diagrams are the top reason for application rejection and resubmission.

2–5 business days
3

Step 3: Submit plumbing permit application online through the registration portal with all required documentation

Complete the electronic application form, uploading your prepared plans, a site plan showing property lines, and the contractor’s state license information. Double-check that all uploaded files are legible and in PDF format. Incomplete submissions are typically rejected within 1-2 business days, restarting the clock.

1–2 hours
5 more steps

See the complete step-by-step process with timelines and tips.

Start Filling

Where to Apply

Applications are handled by your local building department in each city. Select your city below for authority details, fees, and processing timeline.

Other Requirements You'll Need

This is one of 13 requirements for opening a restaurant in Tennessee.

FAQ

Processing times vary significantly based on the project's scope and completeness of the application. Per the Memphis & Shelby County Division of Construction Code Enforcement, the city does not publish a guaranteed timeline. Complex projects, or those missing required documents like a Building Permit approval, can take several weeks. Contact the Code Enforcement office directly to confirm current review timelines.

According to the Memphis & Shelby County Division of Construction Code Enforcement fee schedule, there is a $0–$0 government filing fee for the permit application itself. However, fees are charged based on the valuation and scope of the plumbing work, which is assessed after plan review. Always verify the final fee with the department, as this cost structure is distinct from flat-fee licenses like a City Business License/Registration.

No. Plumbing permits in Memphis are issued for a specific project at a specific address and cannot be transferred. If you are moving your business or starting work at a new location, you must apply for a new permit. This is standard for site-specific approvals, similar to how you must obtain a new Certificate of Occupancy for each new premises.

Plumbing permits are not renewable annual licenses; they are one-time approvals for a specific construction project. The permit is valid until the final inspection is passed and the work is closed out by the inspector. For ongoing operational requirements, you will need separate, renewable licenses such as your annual City Business License.

A city inspector visits your site to verify the installed plumbing matches the approved plans and complies with the Memphis Plumbing Code. They will check pipe sizing, materials, venting, traps, and proper connections to water and sewer lines. All work must be accessible and ready for testing (e.g., water pressure test) before the inspector arrives to avoid a failed inspection and re-inspection fees.

About This Data

This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.

For Tennessee specifically, we have analyzed compliance dossiers for 3 cities (Knoxville, Memphis, Nashville), generating Rich FILs (Form Intelligence Layers) with 25 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.

Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.

157+Cities analyzed
9,849Requirements tracked
8,415Forms analyzed
433,000Fields classified
How we verify data

This Form Is One of 60+ Requirements.

ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.