If your Detroit restaurant needs a temporary sidewalk café, an awning over public property, or any construction that uses the public right-of-way, you cannot proceed without a Right-of-Way Permit from the City of Detroit Department of Public Works. This permission, also called a public space occupancy permit, is a mandatory local requirement.
Most applicants complete this in under 15 minutes with ApronPrep, which auto-fills 22 of 26 fields.
Analyzed from Right-of-Way Permit
85% from one compliance interview
Manual entry or document upload required
In Detroit, a Right-of-Way (ROW) Permit is a mandatory legal requirement for any private construction or repair work that impacts or occupies the city's public infrastructure—the streets, sidewalks, alleyways, and other public land under municipal jurisdiction. The primary legal foundation is rooted in a combination of the Detroit City Code, Chapter 17 – Streets and Sidewalks and specific ordinances governing public works. You need this permit to legally break pavement, install or repair water and sewer laterals, or place any materials or equipment on city property. The application is reviewed by the Detroit Department of Public Works (DPW) to ensure your proposed work adheres to all relevant codes, including sewer use regulations and grease discharge limits, protecting the integrity of the city's infrastructure.
Operating without this permit or failing to adhere to its conditions carries significant, enforceable penalties. The Detroit DPW has the authority to issue immediate stop-work orders and fines. Common consequences include:
Legal code: Local sewer use regulations, water connection requirements, road/sidewalk ordinances, grease discharge limits
Recent update: In recent years, Detroit has moved application submissions for many standard ROW permits online via the city's permitting portal, though certain complex projects may still require in-person coordination with DPW engineering staff.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required if placing any permanent or temporary structure (like a sidewalk cafe enclosure, signage, or HVAC unit) on or over a public sidewalk or street, per Detroit City Code Chapter 39. |
| Bar / Nightclub | Required | Required for outdoor seating, queue barriers, or projecting signage into the public right-of-way, as defined by the Detroit Department of Public Works' permit guidelines. |
| Food Truck | Not Required | Typically exempt; food trucks operate under a separate Mobile Food Vendor License and are governed by designated parking/vending zones, not permanent right-of-way occupancy (Detroit City Code Chapter 24). |
| Coffee Shop / Café | Required | Required for any outdoor furniture (tables, chairs, planters) placed on the sidewalk, as this constitutes an 'encroachment' under the Detroit Right-of-Way Ordinance. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the full legal name of the person submitting the application, matching the name on the business license for the property owner or tenant.
COMMON MISTAKE: Using a business entity name here causes a mismatch with the legal applicant identity.
Enter your official role related to the property or business (e.g., 'Owner', 'Property Manager', 'Authorized Agent').
Provide a direct, working phone number for the applicant where the Detroit Department of Public Works (DPW) can reach you for clarifications.
COMMON MISTAKE: Including a general business line or disconnected number can delay review if inspectors need to contact you.
Provide a valid, monitored email address where official permit notifications, including any stop-work orders or approval letters, will be sent.
Enter the complete and exact street address of the restaurant where the work in the public right-of-way (sidewalk, alley, parking lane) will occur.
COMMON MISTAKE: Using a P.O. Box or a corporate office address instead of the physical site address is a common reason for immediate rejection by DPW reviewers.
Provide a detailed, clear description of all work to be performed in the public right-of-way, such as 'Installation of a new 4-foot diameter concrete patio extension onto the public sidewalk.'
COMMON MISTAKE: Using vague terms like 'outdoor dining setup' instead of specifying materials, dimensions, and permanent/temporary nature can trigger requests for additional information and delay approval by 2-3 weeks.
Select or describe the specific category of work from the Detroit DPW's list, such as 'Sidewalk Cafe', 'Encroachment', 'Construction Occupancy', or 'Excavation'.
COMMON MISTAKE: Incorrectly classifying a permanent structure as a 'temporary use' can lead to enforcement action for operating without the correct permit classification.
List the precise public areas to be used or impacted, using terms like '10-foot section of public sidewalk fronting 123 Main St,' '2 parking meter spaces on Maple Ave,' or 'alley access between parcels.'
COMMON MISTAKE: Failing to specify linear feet or square footage of the public area occupied can result in incorrect fee assessment and permit rejection.
Enter the registered business name of the contractor or construction company that will perform the physical work in the right-of-way, if applicable.
Provide the name of the primary on-site foreperson or project manager for the contractor who the city can contact regarding daily site operations.
ApronPrep auto-fills 22 of 26 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Applicants often submit a simple sketch instead of the required detailed, scaled traffic control plan that meets Detroit Department of Public Works (DPW) Standard Detail Drawings. This omission causes an immediate review suspension, adding 2–3 weeks to your timeline while you re-submit. To avoid this, use the DPW's standard templates for lane closures, signage, and detours, and include a site plan showing all traffic control devices.
Using a generic COI without the specific Detroit DPW named as the certificate holder or lacking the required $2 million general liability coverage triggers a rejection. The city will not accept the application until a compliant COI is filed. Double-check that the 'City of Detroit – Department of Public Works' is listed as the certificate holder and that the coverage amounts, effective dates, and project address exactly match your permit application.
Underestimating the number of days of right-of-way occupancy or listing unrealistic work hours (e.g., proposing work during peak traffic times without approval) leads to permit denial or costly amendments. For example, stating '1 day' for a sidewalk replacement that requires curing time will be flagged. Review the DPW's allowable hours (typically 9:00 AM – 3:30 PM for lane closures) and build in buffer days for weather to set an accurate, approvable schedule.
ApronPrep auto-fills 22 of 26 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Detroit | Contact Detroit Department of Public Works for current fee schedule | Contact Detroit Department of Public Works for estimated processing time |
Contact Detroit Department of Public Works for current fee schedule
Download the official "Right of Way Permit Application" (Form D-102) from the City of Detroit Department of Public Works (DPW) Engineering Division website. You can also request a paper copy by calling (313) 224-3901. Note that you will also need the separate "Certificate of Insurance" form.
Manually enter 50+ fields detailing the project address, contractor information, and a detailed scope of work including dimensions, materials, and traffic control plans. The most common rejection is an incomplete scope that fails to specify exact excavation dimensions and restoration methods as required by Detroit City Code, Chapter 39.
Collect a Certificate of Insurance naming the City of Detroit as an additional insured with minimum $1M liability, two sets of detailed site plans showing the entire right-of-way area, and a notarized affidavit if the applicant is not the property owner. Applications submitted without the insurance certificate are returned immediately.
Applications are handled by your local detroit department of public works in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Michigan.
federal
local
state
federal
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing timelines vary significantly based on project complexity and the Detroit Department of Public Works (DPW) review load. For a simple sidewalk café or sign installation, expect 3-6 weeks. Larger projects involving street excavation, like utility work, can take 8-12 weeks or more. Always submit your application well before your planned start date to account for review and potential revisions, as noted on the DPW application portal.
The initial application itself does not carry a government filing fee according to the Detroit DPW fee schedule, but you will be responsible for associated costs. These typically include required engineering or site plan reviews, inspection fees, and restoration deposits, which vary based on the scope of work. Contact the DPW's Right-of-Way Division for a specific cost estimate before applying. Not legal advice — verify with the Detroit Department of Public Works.
No, right-of-way permits are specific to the location and the project detailed in the approved plans. A permit for one address cannot be transferred to another. You must submit a completely new application for the new location, which will also require a new site plan review and, often, a separate Building Permit if the project involves structural elements.
Right-of-way permits are typically issued for the duration of a specific construction project and expire upon completion and final inspection. For ongoing commercial use of public space, such as a permanent outdoor dining enclosure, you may need an annual or recurring permit. The renewal requirement and timeline will be specified on your permit approval documents from the Detroit DPW. Maintaining a current City Business License/Registration is usually a prerequisite for renewal.
A DPW inspector will visit your site to verify the work matches the approved plans, complies with city code, and does not create public safety hazards. They check for proper installation, material specifications, ADA accessibility compliance, and ensure the public right-of-way is safely maintained during and after work. If the work passes, the inspector will note it for permit closure; if it fails, you'll receive a correction notice detailing what must be fixed before a re-inspection, which incurs additional fees.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Michigan specifically, we have analyzed compliance dossiers for 1 city (Detroit), generating Rich FILs (Form Intelligence Layers) with 26 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.