Why You Need a Water and Sewer Connection Permit

This permit is required to legally connect your restaurant's plumbing system to the municipal water supply and sewer. It ensures the work complies with Miami's specific technical and environmental standards. Legally, this is governed by several local ordinances, including the Miami-Dade County Code of Ordinances covering sewer use, the City of Miami Water & Sewer Department connection requirements, and related road/sidewalk permits for any excavation work. It also enforces compliance with local grease interceptor and wastewater discharge limits to protect the public system.

Failure to obtain this permit before opening or starting construction exposes your business to significant risk. Based on the enforcement actions typically cited by the Miami-Dade Water and Sewer Department and the City of Miami, consequences include:

  • Service disconnection: The city can order your water and sewer service to be physically cut off, halting all business operations.
  • Daily fines: You can be issued citations for each day of non-compliance, with amounts accumulating rapidly.
  • Required remediation: You may be forced to shut down and pay for costly corrections, including excavation and rework of non-compliant plumbing.
  • Lease and insurance issues: Operating without proper permits can violate your commercial lease and invalidate property or liability insurance policies.
  • Permit revocation: For new construction, the city can revoke or refuse to issue your Certificate of Occupancy until the connection is permitted and inspected.

Legal code: Local sewer use regulations, water connection requirements, road/sidewalk ordinances, grease discharge limits

Service disconnection, fines, required remediation, permit revocation

Recent update: As of 2026, Miami-Dade County has integrated its online permit portal more closely with the City of Miami, standardizing the initial application submission process for water and sewer connections.

Who Needs a Water and Sewer Connection Permit?

TypeRequiredNotes
Restaurant (Full-Service)RequiredRequired for all new construction, major renovation, or change of use connecting to Miami-Dade Water and Sewer Department (WASD) mains, as per WASD Rules and Regulations Section 2-2.
Bar / NightclubRequiredRequired to establish a new, separate water meter and sanitary sewer connection for the premises under Miami-Dade WASD regulations, regardless of whether food is served.
Food TruckNot RequiredNot required for the vehicle itself; water and sewer services are typically provided via a commissary's existing, permitted connection, which the truck operator uses under a separate agreement.
Coffee Shop / CaféRequiredRequired due to the installation of plumbing fixtures (sinks, espresso machines, dishwashers) that require a direct, metered connection to public water and sewer lines.
12 more establishment types

See which restaurant types need this requirement — and which don't.

See Full Requirements →

Field-by-Field Guide (31 Fields)

26 of 31 auto-filled

Property Street Address

text
Auto-filled from compliance interview

Enter the complete physical street address where the new water and sewer connections are needed, which must match the legal site address on file with the Miami-Dade Property Appraiser's office.

COMMON MISTAKE: Entering a nearby landmark (e.g., 'next to Publix') or a P.O. Box instead of the exact, numeric street address, which will cause the application to fail initial address verification.

High rejection risk

Property Parcel/Folio Number

text
Auto-filled from compliance interview

Enter the 8 to III-digit Parcel or Folio Number assigned to the property by the Miami-Dade County Property Appraiser, which serves as the official property identifier for utility coordination.

COMMON MISTAKE: Omitting leading zeros or transposing digits from the Parcel ID on your tax bill or property deed, leading to a data mismatch that halts review.

High rejection risk

Property Type

text
Auto-filled from compliance interview

Select or describe the land use (e.g., 'Commercial Restaurant,' 'Fast Food with Drive-Thru,' 'Office Building') as it is formally zoned, which determines required pipe sizes and impact fees.

COMMON MISTAKE: Using a generic term like 'business' or describing the future concept instead of the current, legally-zoned use listed on the county's zoning map.

High rejection risk

Building Dimensions

text
Auto-filled from compliance interview

Enter the proposed or existing building's length and width in feet, as shown on your site plan or architectural drawings, to calculate water demand and required sewer lateral capacity.

COMMON MISTAKE: Providing interior square footage instead of exterior linear dimensions, which is not the metric used by Miami Water & Sewer Department engineers for their capacity calculations.

Building Location on Property

text
Auto-filled from compliance interview

Describe the building's placement relative to property lines (e.g., '30 feet from western property line, 15 feet from northern line') to allow inspectors to locate the connection site.

COMMON MISTAKE: Using vague, non-measured descriptions like 'in the back' or not referencing the required, sealed site plan, resulting in a request for additional information.

Proposed Sewer Connection Point

text
Auto-filled from compliance interview

Indicate the exact spot where the private sewer lateral will connect to the public main, typically described by distance from two permanent landmarks as shown on a licensed surveyor's drawing.

COMMON MISTAKE: Pointing to a manhole or cleanout on an adjacent property you do not own, which constitutes an illegal connection and leads to immediate denial and possible fines.

High rejection risk

Distance from Property Line to Connection Point

text
Auto-filled from compliance interview

Provide the linear measurement in feet from the nearest property boundary to the exact connection point, which determines responsibility for pipe installation and inspection.

COMMON MISTAKE: Guessing the distance or measuring from the wrong property line, which can invalidate the cost estimate and contractor bid for the public-side connection work.

Owner Full Legal Name

text
Auto-filled from compliance interview

Enter the name of the individual or legal entity (e.g., 'Smith Family Trust, LLC') that holds title to the property as recorded with the Miami-Dade Clerk of Courts.

COMMON MISTAKE: Listing a tenant, property manager, or attorney instead of the legal owner, which voids the application's authorization to connect to public utilities.

High rejection risk

Owner Mailing Address

text
Auto-filled from compliance interview

Provide the current mailing address where all permits, invoices, and inspection notices from Miami Water & Sewer Department should be sent, which may differ from the property address.

COMMON MISTAKE: Using an old address or the restaurant's future address, causing critical correspondence and bills to be lost and leading to permit expiration.

Owner Phone Number

text
Auto-filled from compliance interview

Enter a direct, daytime phone number for the property owner or authorized agent to schedule mandatory pre-construction meetings and on-site inspections.

COMMON MISTAKE: Providing a non-responsive number or one that goes to a full voicemail, which can delay the inspection schedule by weeks if the field crew cannot make contact.

21 more fields in this form

ApronPrep auto-fills 26 of 31 fields from a single compliance interview — no re-typing, no guessing what the government expects.

31total fields
26auto-filled
5need attention
Start Filling

Top 5 Water and Sewer Connection Permit Mistakes

1

1. Submitting Incomplete Site Plan Details

Applications are rejected for lacking clear, scaled drawings that show the exact location of the proposed connection point relative to the existing public main, property lines, and all existing buildings. Missing a dimension for the distance from the building to the tap point is a frequent omission. This error forces the City to return the packet, which typically adds 10–14 business days to your timeline as you must have an engineer or architect revise the plans.

2

2. Incorrectly Calculating the Meter or Tap Size

Applicants often select a water meter size (e.g., 1-inch) based on guesswork rather than a professional calculation of the total fixture units and peak demand for the restaurant. Installing an undersized meter will fail inspection and limit your water pressure, while an oversized one incurs higher capacity fees. To avoid this, submit the Fixture Unit Count Calculation sheet required by the Miami-Dade Water and Sewer Department (WASD) Design Manual with your engineer's or plumber's seal.

3

3. Not Obtaining Prior Right-of-Way/Excavation Permits

If your connection requires any work within the public right-of-way (like trenching from the main to your property line), you must secure a separate Right-of-Way Excavation Permit from the City’s Department of Resilience and Public Works BEFORE your water/sewer permit is issued. Applying for the connection permit without this pre-approval results in an automatic hold on your application, adding 3–5 weeks of delays while you navigate a separate permit process.

2 more steps

See the complete step-by-step process with timelines and tips.

Start Filling

Skip the Paperwork on Your Water and Sewer Connection Permit

ApronPrep auto-fills 26 of 31 fields from one compliance interview.

No credit card required

Water and Sewer Connection Permit by City in Florida

CityFee RangeTimeline
JacksonvilleContact JEA for current deposit and connection fee scheduleContact JEA for project-specific timeline
MiamiContact Miami-Dade County Department of Regulatory and Economic Resources for current permit and connection fees2-4 weeks from application submission to final inspection, depending on inspection availability and any required revisions
TampaContact City of Tampa Water Department for current permit, inspection, and connection fees2-4 weeks for permit review and approval, additional time for construction and final inspections

Government Filing Fees

Contact Miami-Dade County Department of Regulatory and Economic Resources for current permit and connection fees

Timeline: Varies

1

Obtain the First Time Sewer Connection application form from Miami-Dade County Department of Regulatory and Economic Resources

Download the 'First Time Sewer Connection' application form from the Miami-Dade Water and Sewer Department's (WASD) official website or pick it up in person at the Water and Sewer Permits office. You need your property's 12-digit folio number from the Miami-Dade Property Appraiser, as the form references this directly. Downloading from the site is fastest; some in-person service centers have limited hours.

1-2 hours
2

Complete the application form with all required property and owner information

Fill out the 4-page application, including the property address, owner/contractor contact details, estimated water/sewer demand in gallons per day (GPD), and contractor license number. The project description field must specify the connection type (e.g., 'new 4-inch PVC sewer lateral for restaurant'). Missing contractor license numbers or GPD estimates are common rejection causes that add a week or more for resubmission.

1-2 hours
3

Gather required supporting documents including property deed and site plans

Compile a property deed or recent tax bill to prove ownership, plus two sets of approved, sealed site plans from a Florida-registered professional engineer or architect. The site plans must show the exact location of the proposed connection relative to property lines and existing WASD infrastructure. Not having sealed plans is the #1 reason for immediate rejection, as per WASD's permitting guide.

1-3 weeks (if plans are not already approved)
6 more steps

See the complete step-by-step process with timelines and tips.

Start Filling

Where to Apply

Applications are handled by your local department of public works (dpw) in each city. Select your city below for authority details, fees, and processing timeline.

Other Requirements You'll Need

This is one of 13 requirements for opening a restaurant in Florida.

FAQ

Processing timelines vary significantly based on project complexity and department review backlogs. For a simple service tap, it could be several weeks, but larger commercial projects often require coordination with a Building Permit and can take 2 to 3 months for final approval from Miami-Dade Water and Sewer. Contact the Miami-Dade Water and Sewer Department directly to confirm current review times for your specific project scope.

The government filing fee for the permit application itself is listed as $0–$0. However, significant costs arise from required infrastructure work, impact fees, and plan review charges levied by Miami-Dade Water and Sewer. The total cost is project-specific, and you must also secure a Certificate of Occupancy before final water/sewer activation. Not legal advice — verify final costs with Miami-Dade Water and Sewer.

No. A water and sewer connection permit is issued for a specific property address and cannot be transferred. If you move your restaurant, you must apply for a new permit at the new location, which involves a new site plan review and fee assessment by Miami-Dade Water and Sewer. This process is similar to applying for the initial permit and is required before any construction or plumbing work begins at the new site.

You do not renew this permit. A water and sewer connection permit is a one-time authorization for the physical hookup to the municipal system. However, you are responsible for maintaining the connection and any related devices, which may require periodic inspections and certifications like an annual Backflow Prevention Device Certification as mandated by Miami-Dade County code.

A Miami-Dade Water and Sewer inspector will verify that the installed piping, valves, meters, and backflow prevention assemblies match the approved plans and meet all county plumbing and safety codes. They will check for proper materials, correct sizing, pressure testing results, and ensure the connection point is accessible. Passing this inspection is mandatory before the utility service is activated and the system can be used.

About This Data

This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.

For Florida specifically, we have analyzed compliance dossiers for 3 cities (Jacksonville, Miami, Tampa), generating Rich FILs (Form Intelligence Layers) with 31 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.

Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.

157+Cities analyzed
9,849Requirements tracked
8,415Forms analyzed
433,000Fields classified

Sources

How we verify data

This Form Is One of 60+ Requirements.

ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.