Without a Water and Sewer Connection Permit from Henderson Utility Services, you cannot turn on utilities, your kitchen cannot operate, and your opening day is indefinitely delayed. This permit, also called a Utility Connection Approval, grants legal access to municipal water and sewer lines. Key facts:
Most applicants complete this in under 15 minutes with ApronPrep, which auto-fills 16 of 19 fields.
Analyzed from Water and Sewer Connection Permit
84% from one compliance interview
Manual entry or document upload required
A Water and Sewer Connection Permit in Henderson is mandated to ensure your plumbing, grease interceptors, and infrastructure comply with city regulations that protect the municipal water supply and wastewater system. This permit is required by the Henderson Municipal Code, specifically under Chapter 13 (Sewers) and Chapter (Water). The Henderson Water Utility Division and Public Works Department issue these permits to verify that your connection plans meet all local sewer use regulations, water connection requirements, road and sidewalk excavation ordinances, and strict grease discharge limits. Without this permit, you legally cannot activate water or sewer service to your new restaurant.
Starting construction or connecting to city utilities without an approved permit triggers immediate and costly consequences. Based on Henderson's fee schedules and code enforcement policies, the typical penalties include:
Legal code: Local sewer use regulations, water connection requirements, road/sidewalk ordinances, grease discharge limits
Recent update: As of 2026, Henderson has integrated its permitting system with Southern Nevada Health District requirements, meaning your grease interceptor specifications are now cross-checked during the water/sewer permit review, adding a critical compliance step for food service businesses.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required to connect a new or modified food service facility to the municipal water and sewer mains, per Henderson Municipal Code Title 9, Utilities. |
| Bar / Nightclub | Required | Required due to installation of plumbing fixtures (sinks, toilets, bar sinks) that require a new or altered connection to the city’s water and sewer systems. |
| Food Truck | Not Required | Typically exempt; water and sewer connections are not made to a mobile unit. A Henderson Business License and health department approval for commissary use are required instead. |
| Coffee Shop / Café | Required | Required for any fixed location installing commercial equipment (espresso machines, dishwashers, sinks) that needs a direct water supply and drainage connection. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the restaurant's complete physical street address (including unit/suite number) as it appears on your property deed or lease agreement.
COMMON MISTAKE: Submitting a P.O. Box, home address, or an outdated mailing address—the City of Henderson Utilities Department requires the exact physical location for infrastructure mapping.
Enter the official lot number assigned to the property by the Clark County Assessor's office, which is separate from the parcel number.
COMMON MISTAKE: Leaving this field blank or confusing it with the parcel number; both are required by Henderson for precise utility system identification.
Enter the 10-digit parcel number (also called an Assessor's Parcel Number or APN) as recorded by the Clark County Assessor.
COMMON MISTAKE: Entering an incorrect or partial number; the correct APN is found on your property tax statement or the county's online parcel viewer.
Enter the legal name of the property owner exactly as it appears on the recorded deed or title.
COMMON MISTAKE: Listing the business name (LLC) if the property is owned by an individual, or vice-versa—this mismatch with county records triggers a review delay.
Provide the owner's current phone number and email address where the City of Henderson Utilities can send official notices.
COMMON MISTAKE: Providing outdated or non-monitored contact info, which can delay inspection scheduling and permit issuance by 1-2 weeks.
Describe the attached proof document (e.g., 'Recorded Deed' or 'Notarized Authorization Letter from Property Owner').
COMMON MISTAKE: Writing 'See attached' without specifying the document type; Henderson reviewers require a clear description to verify authority to connect.
Specify whether this is a 'New Connection,' 'Temporary Service,' 'Modification,' or 'Reconnection' as defined by Henderson Municipal Code Chapter 13.12.
COMMON MISTAKE: Using vague terms like 'hook-up'; incorrect classification leads to wrong fee assessment and plan review routing.
Enter the estimated daily water usage in gallons per day (GPD), typically calculated by a licensed plumber or engineer based on fixture counts.
COMMON MISTAKE: Submitting a guess without professional calculation; an inaccurate estimate can cause the city to reject the application for insufficient capacity planning.
Enter the estimated sewage flow in gallons per day (GPD), which must align with the water demand estimate and Henderson's sewer system requirements.
COMMON MISTAKE: Leaving this blank or entering 'Same as water'; the city requires a separate, justified calculation for sewer system sizing.
Provide a realistic start date (MM/DD/YYYY) for physical connection work, which must be after the expected permit approval date.
COMMON MISTAKE: Listing a date that is too soon (e.g., next week); Henderson uses this to schedule pre-construction inspections, and unrealistic dates cause scheduling conflicts.
ApronPrep auto-fills 16 of 19 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Submitting a hand-drawn sketch or a plan without a professional engineer's or land surveyor's stamp causes immediate rejection. The City of Henderson requires a to-scale site plan that precisely shows the proposed connection points, existing water/sewer mains, and all property lines. For example, a plan missing the seal and signature of a Nevada-licensed professional will be returned, adding 2–4 weeks to your timeline while you get the correct documents.
Guessing the size (e.g., 6-inch vs. 8-inch) or material (PVC vs. ductile iron) of the public water or sewer main you're tying into leads to incorrect fee calculations and potential redesigns. You must verify this information with the Henderson Public Works Department's GIS system or a pre-application records request. An error here can cause a work stoppage if the contractor arrives on-site with the wrong connection fittings, resulting in costly delays.
Entering the parcel number from a property tax bill instead of the official Clark County Assessor's parcel number, or transposing digits, creates a mismatch in the city's system that halts review. This number must exactly match the one on your recorded deed or the county's online parcel viewer. A mismatch triggers a manual verification process, adding 1–2 weeks of administrative delay before your technical review even begins.
ApronPrep auto-fills 16 of 19 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Henderson | Contact Henderson Utility Services for current fee schedule | 10-20 business days for application review and approval (timeline may vary based on inspection availability and project complexity) |
| Las Vegas | Sewer Connection Fee (SCF): $2,551 per 1 ERU (as of 1-1-23) plus administrative fee; total varies based on restaurant water usage calculation | Contact Las Vegas Building & Safety for current processing times; typically 5-10 business days pending completeness of application |
| Reno | Contact authority for current fees - sewer tap permits typically include application, inspection, and connection fees | 4-8 weeks for application review and approval; additional time for inspection scheduling and construction completion |
Contact Henderson Utility Services for current fee schedule
Download the 'Water & Sewer Connection Permit' application (Form 5105) directly from the City of Henderson's Utility Services website or pick up a physical copy at their office. This must be done before any construction begins. Not using the latest version of the form is a common reason for rejection.
Fill out all 58 fields on the application, including the property's Assessor's Parcel Number (APN), legal description, and detailed plumbing fixture counts. You'll need your site plan, approved building permits, and contractor license information. Applications missing the APN or fixture counts are immediately returned.
Submit your completed packet—including the application, site plan, building permits, and contractor's license—via email to utilityservices@cityofhenderson.com or in person at the Development Services Center. Emailed submissions must have all documents as a single PDF to be processed.
Applications are handled by your local department of public works (dpw) in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Nevada.
federal
local
local
federal
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing time varies widely depending on project complexity, inspection scheduling, and approval of associated plans. For simple residential connections, review may take a few weeks, while commercial projects requiring coordination with a Building Permit can extend to several months. Contact the City of Henderson Utility Services Department to confirm the current timeline for your specific application.
According to the City of Henderson fee schedules, the government filing fee for this permit application is $0–$0. However, the total cost to activate service involves significant fees for the physical connection, capacity charges, and plan review, which must be paid directly to the utility. Not legal advice — verify current connection fees and charges with the Henderson Utility Services Department.
No. Permits are issued for a specific property and service address; they cannot be transferred. Any new location requires a separate application and approval, including payment of all applicable connection and capacity fees. This is similar to the site-specific nature of a Certificate of Occupancy, which is also tied to a physical building.
The permit itself is not renewed. Once the connection is installed and approved, the service remains active. You will, however, receive monthly utility bills for water and sewer usage. Your separate Annual Business License Renewal is a recurring requirement that must be completed each year to operate legally.
A city inspector will verify the connection meets all code requirements for materials, depth, and proper installation before the trench is backfilled. They will check for correct fittings, valve placement, and that the connection point to the main line is sealed and pressure-tested. Failing this inspection requires rework, which can delay your overall project timeline and final occupancy approval.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Nevada specifically, we have analyzed compliance dossiers for 3 cities (Henderson, Las Vegas, Reno), generating Rich FILs (Form Intelligence Layers) with 19 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.