Your business cannot legally open or serve customers if it violates federal accessibility standards, which can stop your build-out and financing in its tracks. In Spokane, Washington, this involves a ADA Compliance Self-Certification (also called an Accessibility Compliance Statement) required by federal law and typically submitted as part of your building permit to the Spokane Building & Planning Services Department.
Key facts:
Most applicants complete this in under 15 minutes with ApronPrep, which auto-fills 45 of 54 fields.
Analyzed from ADA Compliance Self-Certification
83% from one compliance interview
Manual entry or document upload required
The ADA Compliance Self-Certification is your documented declaration that your restaurant meets federal accessibility standards under the Americans with Disabilities Act (ADA) Title III and its implementing regulations, the 2010 ADA Standards for Accessible Design. While the ADA is a federal law, Spokane businesses must affirm compliance to the Spokane Building & Planning Department as part of the building inspection process. This requirement is often codified in local occupancy and building code adoptions, such as the Spokane Municipal Code, which mandates adherence to the International Building Code and its accessibility provisions. In practice, the self-certification form serves as a legally binding attestation that your physical premises—including parking, entrances, restrooms, and dining areas—are accessible to all customers.
Failing to complete this certification, or attesting to compliance incorrectly, exposes your business to significant legal and financial risks. These are not theoretical; thousands of ADA Title III lawsuits are filed annually. Based on ApronPrep's analysis of regulatory actions in Washington, the primary consequences include:
Legal code: Americans with Disabilities Act Title III, ADA Accessibility Guidelines (ADAAG)
Recent update: As of 2026, the Spokane Building & Planning Department now requires digital submission of the self-certification form alongside your building permit or Certificate of Occupancy application, eliminating the previous in-person drop-off option.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required because Title III of the Americans with Disabilities Act (ADA) applies to all public accommodations, including places that serve food and drink. |
| Bar / Nightclub | Required | Required as a place of public accommodation under ADA Title III, necessitating a self-certification of barrier removal plans. |
| Food Truck | Not Required | Typically not required for a Spokane-specific self-certification; mobile units are addressed through separate Washington Department of Transportation (WSDOT) and health department accessibility standards for service. |
| Coffee Shop / Café | Required | Required as an establishment serving the public, falling under ADA Title III requirements for accessible entry, service counters, and seating. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the exact legal name of your entity as it appears on your state registration or Articles of Incorporation filed with the Washington Secretary of State.
COMMON MISTAKE: Using the DBA or a shortened/incorrect legal name causes rejection, as the City of Spokane cross-references state corporate records.
Enter the 'Doing Business As' name customers will recognize, if different from your legal name; if not applicable, leave blank or write 'N/A'.
COMMON MISTAKE: Leaving blank when a DBA is registered or writing 'same as above' adds processing time, as reviewers need a clear, separate entry.
Enter the complete physical street address of the restaurant, including unit or suite number, where ADA compliance is being certified.
COMMON MISTAKE: Using a P.O. Box, mailing address, or an incomplete address (missing suite #) is the top cause of rejection for this application.
Enter 'Spokane' as the city for the facility address; do not abbreviate or use surrounding municipality names.
COMMON MISTAKE: Entering 'Spokane Valley' or 'Spokane County' instead of 'Spokane' causes jurisdictional confusion and rejection.
Enter the two-letter postal abbreviation 'WA' for Washington.
COMMON MISTAKE: Writing out 'Washington' in full, while often accepted, can trigger manual review and delay processing.
Enter the 5-digit ZIP code for your facility's physical location; use the full 9-digit ZIP+4 only if it matches your official postal record.
COMMON MISTAKE: Using an incorrect ZIP code that does not correspond to the entered street address is a common data mismatch that halts review.
Enter the full name (first and last) of the person responsible for this application and who can answer city inspector questions.
COMMON MISTAKE: Listing a generic title like 'Manager' instead of a person's name prevents the City of Spokane from establishing a point of contact.
Enter the official job title or role of the primary contact (e.g., Owner, General Manager, Compliance Officer).
COMMON MISTAKE: Leaving this field blank, while not a direct rejection cause, often leads to follow-up requests for information, adding 3-5 business days to your timeline.
Enter a direct, working phone number for the primary contact, including area code, in a standard format (e.g., 509-555-0123).
COMMON MISTAKE: Providing a main restaurant line with no extension or a personal mobile number without a voicemail setup can lead to failed communication attempts by inspectors.
Enter a professional, monitored email address that will be used for all official correspondence and certificate issuance from the City of Spokane.
COMMON MISTAKE: Using a generic info@ email that is rarely checked risks missing critical deadline notices or approval documents.
ApronPrep auto-fills 45 of 54 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Owners of buildings constructed before 1993 often incorrectly assume they are fully exempt, failing to certify the specific 'alterations, path of travel work, or barrier removal' completed since occupancy. This causes the application to be marked incomplete and requires a formal determination letter from the building department, adding 4-6 weeks. To avoid, review any permits for tenant improvements, signage changes, or restroom remodels from the last decade, and detail those projects in the application.
For projects triggered by the 'Alterations' section, applicants commonly list the entire dining room instead of the specific area where the remodel is concentrated (e.g., the new service counter or host stand). This mistake leads to an incorrect scope of required path of travel upgrades and results in a rejection for insufficient information. Be precise: if you remodeled the bar area, that is your Primary Function Area; the application must then address the route from the entrance to that bar.
Entering the total restaurant parking spaces but failing to specify the number of van-accessible spaces and their dimensions (96-inch access aisle) is a top cause of correction notices. The Spokane Building Department cross-references this with your site plan. An example error is listing '5 total spaces' without noting the required 1 van-accessible space. This omission triggers a request for additional information, delaying approval by 2-3 weeks. Pull your most recent site plan and count spaces exactly as shown.
ApronPrep auto-fills 45 of 54 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Seattle | ||
| Spokane | ||
| Tacoma |
Hire a Washington-licensed architect, engineer, or Certified Access Specialist (CASp) to conduct a full Title III ADA survey of your premises. They will evaluate all elements, including parking, entrances, restrooms, service counters, and seating, against 2010 ADA Standards. Have your building's original construction plans and any renovation permits ready for the inspector. The most common delay is failing to schedule this inspection early, as qualified inspectors can have weeks-long waitlists.
Compile your report from the licensed inspector, along with the City of Spokane's official self-certification form (available from the Building & Planning Services Department). You must include a detailed site plan, photographs of compliant elements, and a signed statement from the qualified professional affirming compliance. Incomplete packages, especially those missing the professional's seal and signature, are the top cause of immediate rejection. ApronPrep can auto-fill the applicant information sections to reduce errors.
File your complete package with the Spokane Building & Planning Services Division. Submissions are typically made in person at the City Hall permit counter or via their online permit portal if available. You must include the completed city form, the professional's compliance report, and all supporting documents. The city will not begin its administrative review until all items are received and a file number is assigned.
This is one of 13 requirements for opening a restaurant in Washington.
local
state
federal
state
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsThe processing timeline varies and depends on several factors, including whether your space was built or altered after 1991 and the complexity of your project. According to the Spokane Planning & Building Services Division, projects requiring no modifications or a Building Permit for alterations will see significantly different review times. You must contact the Accessibility Services team directly for a current timeline estimate, as it is not a standard-issue permit.
The Spokane Planning & Building Services Division does not charge a government filing fee for the ADA Compliance Self-Certification itself. However, if your space requires physical modifications to meet accessibility standards, you will incur fees for the required Building Permit and plan review. Not legal advice — verify all costs with Spokane Planning & Building Services.
No. An ADA Compliance Self-Certification is specific to a business's physical premises and its specific design features at that address. If you move your restaurant, you must complete a new self-certification for the new location, as accessibility features like restrooms, ramps, and door widths are evaluated per site. Always contact Spokane Planning & Building Services to confirm the process for your new space.
Spokane does not require periodic renewal of a self-certification once it is accepted. However, you are obligated to maintain the certified accessible features. If you make any alterations to your space—which would require a separate Building Permit—you must submit a new or updated self-certification to reflect those changes, per the Spokane Municipal Code.
An 'inspection' typically refers to the plan review of your self-certification checklist by city staff, not a physical site visit for this specific process. However, if your project triggers a Building Permit, there will be on-site inspections for the construction work. For the self-certification, an Accessibility Specialist reviews your submitted checklist against the applicable ADA Standards for Accessible Design to verify your declared compliance.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Washington specifically, we have analyzed compliance dossiers for 3 cities (Seattle, Spokane, Tacoma), generating Rich FILs (Form Intelligence Layers) with 54 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.