You cannot legally open your restaurant or operate in a new building without a Certificate of Occupancy from the Spokane Building Department, also called a use and occupancy permit. Key facts:
Analyzed from Certificate of Occupancy
81% from one compliance interview
Manual entry or document upload required
A Certificate of Occupancy in Spokane, Washington, is required by the Spokane Municipal Code, primarily under Title 17 (the City's Building Code), which incorporates and administers the Washington State Building Code. This legal framework also includes compliance with the State's Accessibility Code (Chapter 51-50 WAC). The certificate is the final sign-off from the Spokane Building & Planning Services Division, confirming that the construction or remodel of your restaurant's physical space has been inspected and meets all structural, fire safety, life safety, and accessibility standards for its intended use as a public food service establishment. It is the city's official verification that the building is safe for occupants.
Operating without this certificate exposes your business to significant legal and operational risks. Based on the enforcement provisions of the Spokane Municipal Code, common consequences include:
Legal code: State building code (locally administered), local building ordinances, state accessibility code
Recent update: As of 2026, the Spokane Building & Planning Services Division has fully integrated its permit and inspection tracking into a new digital portal, which may affect submission procedures for final inspections and certificate issuance.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required under Spokane Municipal Code § 17C.110.500 for any new construction, change of use, or major alteration of a space used for public assembly and food service. |
| Bar / Nightclub | Required | Required as a place of public assembly; a new or amended CO is mandated per the Spokane Building & Planning Department for any occupancy change. |
| Food Truck | Not Required | Typically exempt from a traditional building CO, but must obtain a Mobile Food Unit Permit from Spokane Regional Health District and comply with fire department inspections for the vehicle. |
| Coffee Shop / Café | Required | Required for the initial occupancy or a change of use of the commercial space, as it is classified under Assembly Group A-2 for customer seating. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the complete physical street address where the restaurant is located (e.g., 123 W Main St, Spokane, WA 99201), exactly as it appears on your lease or deed; this must match the address used for your building permits.
COMMON MISTAKE: Submitting a mailing address, P.O. Box, or the address of a corporate office instead of the physical site address, which will cause the Spokane Building Department to reject the application for incorrect identification.
Enter the specific permit number issued by the Spokane Building Department for the primary construction or tenant improvement project (e.g., BLD-2024-12345), which is found on your approved permit card or inspection record.
COMMON MISTAKE: Confusing this with other permit numbers (like plumbing or electrical), leaving it blank, or entering an incorrect number, which halts the certificate issuance until the correct permit file is located.
Enter the full legal name of the property owner, LLC managing member, or authorized agent legally responsible for the building; use the exact name as registered with the county assessor for ownership records.
COMMON MISTAKE: Listing a contractor, architect, or property manager instead of the legal owner, which invalidates the application's authority and requires a notarized letter of authorization to correct.
Provide a direct, working phone number for the primary contact listed above, including area code, where the Spokane Building Department can reach them during business hours for application questions.
COMMON MISTAKE: Providing a disconnected number, a generic company line with no direct contact, or a phone number for someone who is not the listed owner, causing delays if inspectors need immediate clarification.
Enter a valid, monitored email address for the primary contact; this is where the Spokane Building Department will send the certificate PDF and any official correspondence regarding the application status.
COMMON MISTAKE: Using an outdated or typo-filled email address, which can cause you to miss the issued certificate and official notifications, delaying your opening.
Check this box ONLY after a Spokane building inspector has conducted the final construction inspection for the main building permit and officially marked it as 'Passed' in the city's permit system.
COMMON MISTAKE: Checking this box before the inspection is actually passed, which constitutes falsification of a compliance affidavit and can lead to application denial and potential fines.
Check this box ONLY after a Spokane plumbing inspector has approved the final inspection for all plumbing work, including fixtures, water supply, drain/waste/vent systems, and grease interceptors if required.
COMMON MISTAKE: Assuming the building inspection covers plumbing; this is a separate, mandatory inspection for restaurants, and leaving it unchecked will block certificate issuance.
Check this box ONLY after a Spokane electrical inspector has approved the final inspection for all electrical work, including kitchen equipment circuits, lighting, emergency systems, and panel upgrades.
COMMON MISTAKE: Overlooking low-voltage systems (like fire alarm or data) if they were part of the electrical permit scope; the inspector must pass ALL components under that permit.
Check this box ONLY after a Spokane mechanical inspector has approved the final inspection for all HVAC, exhaust hood systems, make-up air units, and any gas piping related to kitchen equipment.
COMMON MISTAKE: Forgetting that the kitchen hood suppression system (if part of the mechanical permit) must also be inspected and passed by the Fire Department before this box can be checked.
Check this box to affirm that all construction meets the current Washington State Building Code (WSRC) as adopted by Spokane; this is a legal certification typically verified by your architect, engineer, or general contractor.
COMMON MISTAKE: Checking this box without formal verification from a design professional, which can create liability if a code violation is later discovered during a city audit.
ApronPrep auto-fills 17 of 21 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Entering your DBA or a vague use description (e.g., 'restaurant') instead of the precise business name registered with the Washington Secretary of State and the specific NAICS code or use classification from the Spokane Zoning Code. Based on ApronPrep's analysis, this mismatch triggers a review to reconcile records, adding 2–3 weeks to your timeline. Avoid this by using the exact legal entity name from your Business License and stating the use per city code (e.g., 'Restaurant, Full-Service, NAICS 722511').
Checking 'Yes' for all building code compliance questions without documented proof of recent inspections for any tenant improvements. The Spokane Building Division requires verification that all construction was permitted and finalized. Stating compliance without ready inspection sign-offs (like final Electrical or Mechanical) results in immediate rejection and requires re-inspection fees. You must have all finaled permit cards or inspection reports on hand before asserting compliance.
Providing a hand-drawn sketch or an architect’s preliminary plan instead of a scaled, dimensioned floor plan that matches the 'as-built' conditions and includes all required elements: exits, restrooms, seating counts, kitchen equipment layout, and accessibility paths. Incomplete plans are the top cause of processing delays, adding 1–2 weeks for revision requests. Use a site plan stamped by a Washington-licensed design professional if you completed any build-out.
ApronPrep auto-fills 17 of 21 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Seattle | Contact SDCI for current Certificate of Occupancy fees; typically included with permit package | 2-4 weeks after final inspection request, depending on inspection queue and any required corrections |
| Spokane | Contact authority for current fees | Minimum 10 working days advance notice required; actual timeline depends on inspection schedule and any required corrections |
| Tacoma | Contact authority for current fees; typically included in building permit costs | 1-2 weeks after final inspection request, pending no deficiencies; may extend if corrections needed |
Contact authority for current fees
Call or email the Spokane Building and Planning Department's CO coordinator to schedule your final review. You'll need your project's master permit number and estimated completion date. Delaying this call is the most common cause of timeline overruns, as the inspection calendar fills quickly. Duration: 1 hour (to make contact and schedule).
Confirm with each trade inspector (building, plumbing, electrical, mechanical) that their final inspection is signed off in the city's permit tracking system. The CO will be denied if any single trade inspection shows 'pending' or 'failed.' Gather the signed inspection cards or printouts as proof. Duration: 1–3 days (to verify all systems).
Secure final sign-offs from the Planning Division for zoning compliance and from Public Works for site/access issues. For restaurants, you'll also need a signed approval from the Spokane Regional Health District showing your food service permit is ready for issuance. Missing one departmental approval halts the entire process. Duration: 3–5 business days (if all prior approvals are in order).
Applications are handled by your local building department in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Washington.
federal
local
state
federal
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing time varies significantly based on the scope of work and current city review backlogs. For a new build or major remodel, expect the final review and inspection process to take several weeks after the building permit is finalized. Per the Spokane Planning & Development Services application guide, the timeline is not fixed, so contact the Inspection Services Division to get a current estimate for your project type.
The City of Spokane does not charge a separate government filing fee for the certificate of occupancy itself. The cost is typically included in the fees for the underlying Building Permit and other required inspections. Not legal advice — verify final project costs with Spokane Planning & Development Services.
No, a certificate of occupancy is issued for a specific business at a specific address and building. It cannot be transferred. If you move, you must apply for a new certificate of occupancy at the new location, which will require a new building permit and inspection cycle to verify compliance with current codes for the new space.
A certificate of occupancy in Spokane does not have a periodic renewal requirement. It remains valid as long as the occupancy type and use of the building do not change and the structure complies with the codes under which it was approved. However, changes in business activity or building alterations may trigger a need for a new certificate, similar to starting the process for a new City Business License/Registration.
A city inspector will conduct a final walkthrough to verify the completed construction matches the approved building plans and complies with all applicable building, fire, mechanical, and plumbing codes. They check for safe egress, proper installation of life-safety systems, and that the space is suitable for its intended occupancy classification. Passing this final inspection is the last step before the certificate is issued.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Washington specifically, we have analyzed compliance dossiers for 3 cities (Seattle, Spokane, Tacoma), generating Rich FILs (Form Intelligence Layers) with 21 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.