Your new restaurant cannot receive its Certificate of Occupancy, and garbage collection may be denied, until your dumpster enclosure design is approved by the Spokane Planning & Development Services Department. This requirement, also called a Waste Storage and Collection Enclosure Permit, ensures your dumpster area meets city codes for screening and accessibility. Key facts:
Analyzed from Dumpster/Refuse Enclosure Permit
84% from one compliance interview
Manual entry or document upload required
You need a Dumpster/Refuse Enclosure Permit in Spokane because it ensures your commercial waste handling complies with multiple city ordinances designed to protect public infrastructure and the environment. This permit consolidates review under Spokane Municipal Code (SMC) sections governing stormwater management, grease discharge, and right-of-way usage. Specifically, the city references SMC chapters related to sewer use, water connection requirements, and road and sidewalk ordinances to verify that your dumpster location and containment system won't cause spills, block public pathways, or violate discharge limits. The permit is issued by the Spokane Public Works Department after review confirms your proposed enclosure meets all technical standards for size, construction, and placement.
Operating a commercial dumpster without this permit triggers immediate enforcement. Based on typical code enforcement actions, the consequences include:
Legal code: Local sewer use regulations, water connection requirements, road/sidewalk ordinances, grease discharge limits
Recent update: In 2026, Spokane has shifted to prioritize electronic plan submissions for dumpster enclosure reviews, aiming to reduce initial review timelines, though in-person site inspections remain mandatory before final approval.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required per Spokane Municipal Code (SMC) §17C.120.210 for any business generating solid waste that uses a commercial dumpster or compactor. |
| Bar / Nightclub | Required | Required under SMC §17C.120.210 due to significant volume of glass, bottles, and packaging waste that necessitates a commercial dumpster. |
| Food Truck | Not Required | Typically exempt; waste is handled via mobile operation's service agreements and does not involve a permanent, on-site commercial dumpster requiring enclosure. |
| Coffee Shop / Café | Required | Required if using a commercial dumpster; the high volume of cardboard, cups, and grounds qualifies as solid waste under SMC §17C.120.210. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the exact legal name of your business as it appears on your Washington State Business License or Articles of Incorporation; do not use a 'doing business as' (DBA) name unless it is officially your registered legal name.
COMMON MISTAKE: Using a DBA/trade name here causes rejections as it must match official state registration for permit issuance.
Enter the primary business contact phone number, including area code, where city inspectors can reach you during business hours for questions or to schedule a site inspection.
Enter an active business email address that is checked regularly, as the Spokane Planning Services Division will send all permit status updates and approval notices electronically.
COMMON MISTAKE: Using a personal or infrequently checked email can cause you to miss inspection notices, delaying approval by weeks.
Enter the official street or PO Box address where you receive business mail, which may be different from the restaurant's physical location; this is where the city will mail the final approved permit certificate.
Enter the complete physical street address of the restaurant property where the dumpster enclosure will be constructed, as listed on your lease or property deed; the city uses this to verify zoning district and setback requirements.
COMMON MISTAKE: Entering an incorrect suite number or parcel identifier fails the zoning verification, requiring a new application submission.
Select whether you own the property or lease it; if you lease, you must provide the property owner's information and often need their signature on the permit application.
COMMON MISTAKE: Selecting 'Owner' when you are a tenant triggers an automatic rejection because owner notification is a legal requirement per Spokane Municipal Code.
If you are a tenant, enter the full legal name of the individual or entity that owns the property, as shown on the county tax assessor's records; this is required for owner notification.
COMMON MISTAKE: Leaving this blank when 'Lease' is selected, or entering the property management company instead of the legal owner, causes application holds.
Provide a working phone number for the property owner; the city may contact them to verify awareness of the enclosure construction and confirm lease terms allow modifications.
Enter the total count of all refuse containers (dumpsters, compactors, recycling bins) that will be stored within the proposed enclosure; this determines minimum enclosure size per Spokane code.
COMMON MISTAKE: Under-counting leads to an undersized enclosure design that will fail the plan review, adding 2-3 weeks for resubmission.
List the capacity in cubic yards for each dumpster (e.g., '2 yd, 4 yd'); if sizes vary, list all separated by commas, as this data is used to calculate required enclosure dimensions and gate clearance.
COMMON MISTAKE: Writing vague descriptions like 'large' or guessing the size instead of confirming with your waste hauler results in a non-compliant enclosure plan.
ApronPrep auto-fills 37 of 44 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Applicants often attach general property surveys but fail to detail the enclosure's exact footprint, height, and clearances. This omission triggers a 'Request for Additional Information,' adding 2–3 weeks to review. Avoid this by providing a separate, scaled drawing that labels the enclosure's length, width, height, and its distance from property lines and building walls.
Writing 'wood fence' or 'metal screening' on the application is insufficient and will be rejected. The City of Spokane requires specific, approved materials per zoning code (e.g., '6-foot-high, sight-obscuring fence of pressure-treated cedar'). To avoid delay, review the Spokane Municipal Code (SMC) sections cited in the permit guide and list materials exactly as described.
The permit fee is based on the total square footage of the enclosure walls. A common error is calculating only one wall's area or forgetting to include gated openings, leading to an underpayment and application hold. Measure the total exterior surface area (length x height for each wall) and enter it precisely in the designated field to ensure correct fee assessment.
ApronPrep auto-fills 37 of 44 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Seattle | ||
| Spokane | ||
| Tacoma | Contact Tacoma Environmental Services for current permit fees |
Gather a detailed site plan showing the proposed enclosure's exact location, dimensions, and construction materials, along with photos of the existing site. You must also have your contractor's license and State UBI number ready. The most common reason for immediate rejection is submitting a hand-drawn sketch instead of a scaled, professional site plan.
File your completed Application for Sidewalk/Curb Cut/Dumpster Enclosure permit (Form BCA-2) and all supporting documents with the Spokane Public Works Department. Submissions are accepted in person or by mail to their permit counter. Be prepared to pay the **$235 government filing fee** (as of 2026) at this time. Applications are often returned if the fee check is not included.
A city plans examiner reviews your submission for compliance with Spokane Municipal Code (SMC) Chapter 17C and the International Fire Code. If the application passes the desk review, a city inspector will visit your site to verify the proposed location meets setback requirements from property lines and buildings. This inspection is mandatory and cannot be scheduled until after the application is accepted.
Applications are handled by your local department of public works (dpw) in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Washington.
federal
local
state
federal
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing time varies. According to the Spokane Planning & Development Services (PDS) application guide, timeline depends on application complexity and staff review workload. For standard, complete applications, plan for several weeks; contact Spokane PDS at (509) 625-6300 for a current estimate.
Government filing fees range from $0–$0 for the permit application itself, per the City of Spokane fee schedule. However, you are responsible for costs related to the construction, which may require a separate Building Permit and associated plan review fees. Not legal advice — verify final costs with Spokane Planning & Development Services.
No, permits are site-specific. A permit issued for one address cannot be transferred to another. You must apply for a new permit at the new location, as the review is based on specific site conditions, including proximity to property lines and compliance with the Certificate of Occupancy requirements for the new space.
Typically, the permit itself does not require periodic renewal as long as the enclosure remains compliant and unchanged. However, if you modify the enclosure or its location, you must apply for a new permit. The structure must be maintained to code; contact Spokane PDS to confirm if any ongoing certification is required.
A city inspector verifies the enclosure is built per the approved plans and meets Spokane Municipal Code requirements. They check dimensions, materials, screening, gate operation, and proper setbacks from property lines. Failure can require corrections and a re-inspection, delaying your ability to use the dumpster for business operations.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Washington specifically, we have analyzed compliance dossiers for 3 cities (Seattle, Spokane, Tacoma), generating Rich FILs (Form Intelligence Layers) with 44 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.