Without approval from the Seattle & King County Department of Public Health, your construction plans will be rejected by the building department and your permits frozen. The Food Establishment Plan Review—also called a food service construction plan or design approval—is a mandatory submission to the health authority before you can break ground on kitchen equipment or build-out.
Most applicants complete this form in under 15 minutes with ApronPrep, which auto-fills 64 of 77 fields.
Analyzed from Food Establishment Plan Review
83% from one compliance interview
Manual entry or document upload required
The Food Establishment Plan Review is mandated in Seattle under Washington State's WAC 246 - 215, the state's Food Service Rules, as locally enforced and interpreted by the Seattle & King County Public Health Department. This legal framework requires all new, remodeled, or converted food service operations to submit detailed construction and equipment plans for pre-approval before any work begins. The review ensures your physical layout, equipment specifications, plumbing, and ventilation systems are designed to meet the minimum sanitary standards to prevent foodborne illness, as codified in the Washington State Retail Food Code. This is not just a formality; it is a legal prerequisite to obtaining your final operating permit.
Starting construction or ordering equipment without an approved plan review is a violation that triggers immediate enforcement actions. Based on analysis of enforcement cases in this jurisdiction, the practical consequences include:
Legal code: State food code (locally administered), local health regulations, state sanitary code
Recent update: As of 2026, Seattle & King County Public Health has fully integrated its plan review portal with the city's building permit system, requiring electronic submission of health department plans concurrently with certain building permit applications to avoid coordination delays.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required by Seattle Food Code § 12-08.1 as a food establishment preparing potentially hazardous food for onsite consumption. |
| Bar / Nightclub | Required | Required if kitchen operations involve food preparation beyond simple reheating or assembly, per Seattle Food Code § 12-08.1 definitions. |
| Food Truck | Not Required | Typically requires a separate Mobile Food Unit Permit from Seattle & King County Public Health; a full plan review is not needed unless constructing a new commissary kitchen. |
| Coffee Shop / Café | Required | Required if handling ready-to-eat food (e.g., pastries, sandwiches) requiring temperature control, as defined under Seattle Food Code. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Check this box only if your restaurant will cook eggs using Method 1 as defined by the <strong>Seattle Food Code § 3-501.16</strong> — typically for instant-service or pooled eggs cooked to <strong>158°F</strong>. ApronPrep auto-fills this based on your menu data.
COMMON MISTAKE: Applicants check both egg cooking boxes, which Seattle reviewers flag as contradictory — the form requires you to select only <strong>one cooking method</strong>.
Check this box only if your restaurant will cook eggs using Method 2 as defined by the <strong>Seattle Food Code § 3-501.16</strong> — typically for eggs held for service, requiring a consumer advisory notice. ApronPrep auto-fills this.
COMMON MISTAKE: Checking Option 2 but failing to include the required consumer advisory language on your menu, causing a <strong>plan rejection</strong>.
Check this box if your facility will <strong>store, handle, or prepare any raw animal foods</strong> (beef, poultry, fish, shellfish). This triggers specific HACCP plan and equipment requirements.
COMMON MISTAKE: Failing to check this box when your menu includes raw bar items or steak tartare, which leads to an <strong>incorrect equipment review</strong> and rejection.
Check this box if you will use <strong>raw, unpasteurized shell eggs</strong> in any preparation (e.g., Caesar dressing, tiramisu). This mandates a HACCP plan per <strong>Seattle Food Code § 8-201.14</strong>.
COMMON MISTAKE: Confusing 'raw shell eggs' with pre-pasteurized liquid eggs; checking this unnecessarily adds <strong>weeks</strong> to your review for a required HACCP plan.
Enter the <strong>exact legal business name</strong> as it appears on your state business registration and lease. Use the full name, no abbreviations.
COMMON MISTAKE: Using a DBA or marketing name instead of the legal entity name, causing a mismatch with supporting documents and a <strong>rejection for inconsistency</strong>.
Enter 'Yes' to confirm your plans include a <strong>separate, floor-mounted service sink</strong> for mop water disposal, as required by <strong>Seattle Food Code § 5-205.12</strong>.
COMMON MISTAKE: Leaving blank or entering 'Planned' — the Seattle reviewer needs an unambiguous 'Yes' or the application is <strong>flagged incomplete</strong>.
Enter 'Yes' to confirm your facility design provides employee restrooms within <strong>200 feet</strong> and public restrooms if you have dining seats, per <strong>Seattle Food Code § 6-202.11</strong>.
COMMON MISTAKE: Forgetting to account for 'if seating is offered' — answering 'Yes' without seating triggers reviewer questions and <strong>delays</strong>.
Enter 'Yes' to confirm hand sinks are shown on your plans within <strong>25 feet</strong> of all prep areas, as mandated by <strong>Seattle Food Code § 5-204.11</strong>.
Enter 'Yes' to confirm your equipment schedule lists sufficient refrigeration capacity (<strong>1.5 cubic feet per 100 meals</strong>) to meet your proposed menu volume.
Enter 'Yes' to confirm all finishes in food areas are <strong>smooth, non-absorbent, and easily cleanable</strong> (e.g., epoxy floors, FRP walls) as per <strong>Seattle Food Code § 6-201.11</strong>.
ApronPrep auto-fills 64 of 77 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Using simplified drawings or plans not drawn to a standard 1/4' = 1' scale causes immediate rejection, as the Seattle Health Department (per WA State Retail Food Code WAC 246-215) requires precise measurements for equipment placement and aisle clearances. This mistake adds 2–4 weeks as you must engage an architect or certified designer to redraft the plans. Avoid this by ensuring your submitted floor plan includes a north arrow, clearly labeled equipment (model numbers help), and complies with all fixture schedule requirements from the Seattle Food Establishment Plan Review Packet.
Omitting the required details for sinks, handwashing stations, or refrigeration units in the fixture schedule is a top rejection reason. The schedule must list fixture type, model number, capacity, and water/waste connection specs. For example, listing a '3-compartment sink' without the basin dimensions (e.g., 18' x 24' x 14') will trigger a review hold. This adds 1–2 weeks for corrections. Cross-reference each piece of equipment on your floor plan with a complete entry in the fixture schedule before submitting.
Providing a vague menu description (e.g., 'serving breakfast') instead of a detailed list of all food items and processes can cause your establishment to be misclassified, requiring different equipment or plumbing standards. For instance, if you plan to slice cured meats but don't list it, you may fail to provide the required dedicated slicer station and sneeze guard. This mistake can lead to a re-review or on-site inspection failure, delaying opening by 3+ weeks. List every food item, preparation method (raw, cooked, reheated), and any specialty processes like smoking or vacuum packing.
ApronPrep auto-fills 64 of 77 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Seattle | ||
| Spokane | Contact Spokane Regional Health District for current fee schedule | Not specified on page |
| Tacoma |
Gather floor plans (drawn to scale, minimum 1/8" = 1'), equipment specifications, menu, and food preparation procedures before submitting. You'll need: architectural drawings showing layout, equipment placement, and utility connections; a list of all food preparation areas and equipment; your proposed menu with cooking methods; and proof of ownership or lease authorization. Missing or incorrect floor plans are the #1 cause of rejection — ensure dimensions are labeled and all food contact surfaces are clearly marked.
File your Food Establishment Plan Review application online through the King County environmental health portal (kingcounty.gov/health) or in person at the Environmental Health Division office (401 5th Ave, Seattle). Include: completed Plan Review Application form, floor plans, equipment list, menu, and a check for the government filing fee (currently $0 for the plan review — however, separate construction or modification permits may require additional fees; contact the Health Department to confirm current fees for your specific project). Applications submitted online receive faster processing acknowledgment.
The Seattle-King County Health Department reviews your submitted documents for completeness and code compliance with Washington State Health & Safety Code § 246-215 and Seattle Municipal Code § 7.14. A health officer will check for proper equipment placement, adequate hand-washing stations, correct food storage zones, and compliance with critical control points. If your application is incomplete or shows code violations, the department will issue a rejection or request modifications — you'll have up to 30 days to resubmit corrected plans.
Applications are handled by your local board of health in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Washington.
federal
local
state
federal
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsTimeline varies depending on plan complexity and completeness of your submission, per the Seattle-King County Department of Public Health application guide. Initial review typically takes 2–4 weeks if your plans are complete; however, most applicants receive at least one round of comments requiring resubmission, which adds 1–2 weeks per revision cycle. Contact the Seattle-King County Department of Public Health to confirm current processing times for your specific project scope.
According to the Seattle-King County Department of Public Health fee schedule, the government filing fee range for food establishment plan review is $0–$0. However, you may incur additional costs for required professional plan preparation, engineering certifications, or third-party inspections (such as Backflow Prevention Device Certification). Contact the Seattle-King County Department of Public Health to confirm which ancillary services your specific plan review requires. Not legal advice — verify current fees directly with the department.
No — a food establishment plan review is location-specific and cannot be transferred to a different address. If you relocate your restaurant, you must submit a new plan review application for the new site, even if your menu, equipment, and operational procedures remain identical. Contact the Seattle-King County Department of Public Health early in your site selection process to understand whether your new location's layout and utilities will require significant plan modifications.
Food establishment plan reviews do not expire and do not require renewal — they are valid indefinitely as long as your operation remains unchanged and your facility maintains compliance with the approved design. However, if you significantly alter your menu, add new equipment categories, modify food preparation areas, or change your operational procedures, you must submit an amended plan review for the modified scope. Any major renovations or equipment installations should be reviewed by the Seattle-King County Department of Public Health to determine whether a new plan review application is required.
The Seattle-King County Department of Public Health conducts a detailed review of your submitted plans against state and local food service regulations, including layout adequacy, equipment placement, handwashing station locations, temperature control capacity, and waste management systems. Inspectors verify that your design supports safe food handling, prevents cross-contamination, and meets accessibility requirements such as ADA Compliance Self-Certification standards. Most facilities receive a written report with either approval, conditional approval (with required modifications), or rejection with specific corrective actions needed before resubmission.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Washington specifically, we have analyzed compliance dossiers for 3 cities (Seattle, Spokane, Tacoma), generating Rich FILs (Form Intelligence Layers) with 77 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.