Without a Grease Trap/Interceptor Permit from the Houston Health Department, you risk immediate citations, severe daily fines, and an inability to legally operate your kitchen's plumbing. This permit, also known as a Fats, Oils, and Grease (FOG) control device permit, is issued by Houston Public Works under the city's wastewater ordinance. Key facts:
Analyzed from Grease Trap/Interceptor Permit
83% from one compliance interview
Manual entry or document upload required
The City of Houston's Grease Trap/Interceptor Permit is a mandatory requirement primarily under the City of Houston Code of Ordinances § 47-1, which governs wastewater management and sewer use. This ordinance, enforced by the Department of Public Works and Engineering (PWE), specifically prohibits the discharge of fats, oils, and greases (FOG) in amounts that could obstruct public sewers or interfere with the operation of the city's wastewater treatment facilities. The permit process is the city's formal mechanism to review and approve the design, capacity, and installation of your grease control equipment before you connect to the municipal sewer system, ensuring compliance from day one.
Operating a food service establishment without this permit or failing to maintain your grease interceptor carries significant and escalating consequences. Common penalties enforced by Houston PWE inspectors include:
Legal code: Local sewer use regulations, water connection requirements, road/sidewalk ordinances, grease discharge limits
Recent update: In recent years, Houston PWE has increased its use of remote video inspections for grease interceptor installations and repairs to accelerate permit close-outs, though in-person inspections are still commonly required for initial installations.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required per Houston Code of Ordinances § 47-11 because these facilities generate fats, oils, and grease (FOG) from food preparation, dishwashing, and floor drains. |
| Bar / Nightclub | Required | Required if the establishment has a kitchen or food service component, as it discharges grease-laden wastewater into the city sewer under the city’s FOG control program (Houston Code § 47-11). |
| Food Truck | Not Required | Not required for the mobile unit itself, but the commissary kitchen where it operates must have a permitted grease interceptor, as the truck connects to that facility’s waste system for cleaning. |
| Coffee Shop / Café | Not Required | Typically exempt unless they have a full kitchen preparing greasy foods; beverage-only operations with minimal food prep (e.g., pastries) do not trigger the requirement under standard thresholds. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the exact, full legal name of your business entity as it appears on your Texas Secretary of State registration or Assumed Name Certificate (DBA) filing.
COMMON MISTAKE: Using a trading name (like 'Joe's Diner') instead of the registered legal name (like 'JDH Houston, LLC'), which causes document mismatch and delays.
Enter the complete, physical street address where the grease interceptor will be installed, which must match the address on your Houston Food Service Permit and Certificate of Occupancy.
COMMON MISTAKE: Entering a mailing address, P.O. Box, or owner's home address, which is grounds for immediate rejection by Houston Public Works.
Check this box to affirm you possess documentation proving legal ownership or right to operate at the business address, such as a lease or deed.
COMMON MISTAKE: Leaving the box unchecked because the form requires an affirmative declaration; an unchecked box can be interpreted as 'no' and stall the application.
List the specific documents you will submit as proof, such as 'Lease Agreement between [Owner] and [Business Name]' or 'Warranty Deed for [Address]'.
COMMON MISTAKE: Writing vague terms like 'lease' or 'deed' without specific parties and addresses, which fails to meet Houston's documentation specificity requirement.
Check this box only if you already hold a valid, current City of Houston Food Service Operating Permit or equivalent city business license for this address.
COMMON MISTAKE: Checking the box if you have only applied for but not yet received the permit, which constitutes a false statement and leads to permit revocation.
Enter the exact permit number and issuing authority, for example: 'City of Houston Food Service Permit #HOU-FS-123456'.
COMMON MISTAKE: Listing an expired permit, a Harris County permit instead of a City of Houston permit, or omitting the permit number entirely.
Specify the primary business activity, such as 'Full-Service Restaurant', 'Fast Food', 'Catering Kitchen', 'Bakery', or 'Food Truck Commissary'.
COMMON MISTAKE: Using overly broad or non-standard terms like 'eatery' or 'food place', which do not align with Houston's classification system for waste calculations.
Describe all kitchen activities that generate Fats, Oils, and Grease (FOG), such as 'deep frying, grill cleaning, dishwashing, and floor mopping'.
COMMON MISTAKE: Omitting major activities like 'dishwashing from a 3-compartment sink' or 'floor drain runoff', which underestimates FOG load and leads to undersized interceptor requirements.
State how often grease-laden wastewater is discharged, such as 'continuous during operating hours' or 'intermittent, 4 times per day'.
COMMON MISTAKE: Writing 'daily' instead of specifying if it's continuous or in batches; this detail is critical for Houston's hydraulic loading calculations.
Specify the model and type of grease control device, such as 'Gravity Grease Interceptor (GGI), 1000-gallon capacity' or 'Automatic Grease Recovery Unit (AGRU), Model XYZ'.
COMMON MISTAKE: Listing a 'grease trap' (typically under 50 gpm) when Houston code requires a 'grease interceptor' (over 50 gpm) for most restaurants, resulting in an automatic plan rejection.
ApronPrep auto-fills 20 of 24 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Omitting the licensed professional's stamp and signature on the plumbing drawings is a top rejection reason. The Houston Public Works Department requires a wet-signed and sealed plumbing plan showing the exact trap location, pipe sizes, and drainage layout. Without this, your application is considered incomplete and is returned, which can add 2-4 weeks to your timeline. Hire a Texas-registered plumber to prepare and seal the drawings before submission.
Using generic fixture counts or the wrong calculation method leads to an undersized trap, which will fail review. The permit requires sizing based on the Houston Plumbing Code (Chapter 10) using fixture discharge rates for your specific sinks, dishwashers, and floor drains. For example, listing a 20-gallon-per-minute (gpm) trap for a kitchen with a commercial dishwasher that needs 35 gpm causes immediate rejection and requires a full re-submission with corrected engineering specs.
Entering the restaurant's trade name (DBA) instead of the legal business name registered with the Texas Secretary of State, or using a P.O. Box for the physical address, triggers a mismatch with city records. The Houston Wastewater Division cross-checks this data. For instance, listing 'BBQ Palace' when your LLC is 'Houston Smokehouse, LLC' will cause a delay for verification, adding 1-2 weeks. Always use the exact legal name and the street address of the food service establishment.
ApronPrep auto-fills 20 of 24 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Dallas | ||
| Houston | Contact Houston Health Department for current fee schedule | Contact Houston Health Department for processing timelines |
| San Antonio | Contact San Antonio Water System for current fee schedule | 180 days from effective date of ordinance for new interceptor installation; Annual inspection cycle thereafter |
Contact Houston Health Department for current fee schedule
Review Chapter 36 of the Houston Code of Ordinances to identify your establishment type. Food establishments (restaurants, cafeterias) require a Generator Registration, while non-food grease generators (car washes, laundromats) need a Generator Permit. The Health Department rejects applications submitted under the wrong type, which can delay your process by 1–2 weeks. Gather your lease, business license, and a preliminary kitchen layout to verify your classification.
Download the correct PDF form from the Houston Health Department’s online portal. The Generator Registration application has 45 fields; ApronPrep auto-fills 33. You must provide detailed kitchen schematics showing all grease-producing fixtures, plumbing connections, and the proposed trap/interceptor location. Missing or unclear diagrams are the top cause of rejection. Plan to spend 2–3 hours gathering floor plans, fixture specs, and contractor information.
File your completed packet (application, floor plans, fixture list) via the city's online submission portal or by mail to 8000 North Stadium Drive, Houston, TX 77054. You must include proof of business registration (certificate of occupancy or state business filing). In-person submissions can expedite initial review but are not required. Applications submitted without proof of business registration are held for 5–10 business days until documentation is provided.
Applications are handled by your local department of public works (dpw) in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Texas.
federal
local
federal
state
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing times are set on a case-by-case basis by the Houston Health Department. Per the department's application guide, you must contact the Bureau of Consumer Health Services directly for current timelines, as they depend on inspection scheduling and plan review. This process typically runs concurrently with your Building Permit review, so plan accordingly.
There is no separate government filing fee for the permit itself, per the Houston Code of Ordinances. However, costs are incurred through required plan reviews and inspections conducted by the Health Department. Not legal advice — verify specific assessment fees with the Houston Health Department.
No, permits are specific to the location and plumbing configuration for which they were approved. If you move or remodel, you must apply for a new permit. This new application will trigger a fresh plan review and inspection, similar to the initial process for a Certificate of Occupancy.
The permit itself does not have a standard annual renewal. Ongoing compliance is enforced through mandatory grease interceptor maintenance and annual waste hauler reports submitted to the Health Department. Contact the department to confirm current reporting requirements and inspection frequency for your facility.
A Health Department inspector verifies the interceptor's installation matches approved plans, checks for proper size/capacity, and ensures correct plumbing connections. They also confirm the unit is accessible for service and that a maintenance log is onsite. Failure can delay all related permits, so ensure your Plumbing Permit work is complete and signed off first.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Texas specifically, we have analyzed compliance dossiers for 3 cities (Dallas, Houston, San Antonio), generating Rich FILs (Form Intelligence Layers) with 24 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.