Your patio chairs and cafe tables will sit empty—and risk daily fines—until you secure an Outdoor Seating/Sidewalk Cafe Permit (also called a public right-of-way use permit) from the City of Spokane’s Street Department. Key facts:
Most applicants complete this in under 15 minutes with ApronPrep, which auto-fills 29 of 35 fields.
Analyzed from Outdoor Seating/Sidewalk Cafe Permit
83% from one compliance interview
Manual entry or document upload required
Operating a sidewalk cafe in Spokane without a permit is a direct violation of the Spokane Municipal Code, specifically Title 12A (Business Licensing) and Title 17C (Land Use Standards). The permit is issued by the Spokane Business & Development Services Center and coordinates with the Engineering Services and the Spokane Police Department. It codifies public space usage, ensuring your seating layout complies with the Americans with Disabilities Act (ADA) for clear pedestrian pathways and meets fire department egress requirements. This legal framework prevents private commercial use of public right-of-way from blocking access or creating safety hazards.
Failing to secure this permit before setting up tables carries immediate, enforceable penalties. Based on application reviews and enforcement actions, common consequences include:
Legal code: Local licensing bylaws, general business license requirements, entertainment regulations
Recent update: As of 2026, the City of Spokane has consolidated review for sidewalk cafe permits through the Business & Development Services Center to streamline inter-departmental coordination, though physical plan review by Engineering is still required for layout approval.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required per Spokane Municipal Code (SMC) Title 17C, as any business proposing to use public right-of-way for seating must obtain a Sidewalk Cafe Permit from the City's Public Works Department. |
| Bar / Nightclub | Required | Required, as SMC Title 17C governs all commercial uses of the sidewalk, and bars serving food/drink in outdoor areas on public property must secure this permit. |
| Food Truck | Not Required | Typically exempt, as this permit specifically governs fixed, semi-permanent structures on the sidewalk; food trucks operate under separate Mobile Food Unit and vending location permits per SMC Chapter 10.02. |
| Coffee Shop / Café | Required | Required, as the definition of a 'sidewalk cafe' under SMC Title 17C includes any establishment serving food or beverages for consumption in a designated outdoor area on public property. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter your business's legal name exactly as it is registered with the Washington Secretary of State or Spokane County, such as 'XYZ Restaurant Group LLC' or 'John Doe Enterprises Inc.'
COMMON MISTAKE: Submitting a trade name or DBA (like 'The Corner Cafe') instead of the registered legal entity name, which will cause Spokane's Planning & Development Services to reject the application.
Enter your 'Doing Business As' name if your restaurant operates under a public-facing name different from the legal name, such as 'The Spokane Grill' for 'Evergreen Holdings LLC'.
COMMON MISTAKE: Leaving this field blank when a DBA is used, causing inconsistencies with signage plans or public notifications required for the permit.
Provide the complete physical street address of your restaurant, including suite or unit number, as verified by Spokane's parcel database for zoning review.
COMMON MISTAKE: Entering a mailing address, P.O. Box, or corporate office address instead of the precise physical location where the sidewalk cafe will operate.
Enter 'Spokane'—applications for properties outside city limits must be filed with Spokane County, not the city's Planning & Development Services.
COMMON MISTAKE: Listing a neighboring municipality like 'Spokane Valley', which routes the application to the wrong jurisdiction and causes significant delays.
Enter 'WA' or 'Washington'—the state must match the jurisdiction of your business registration and sales tax permit.
Provide the full 5-digit ZIP code for your restaurant's location; Spokane uses this to confirm the property is within a zoning district that permits sidewalk cafes.
COMMON MISTAKE: Using an incorrect or outdated ZIP code, which can trigger a zoning district mismatch and require manual verification, adding 1–2 weeks to review.
Enter your 9-digit Federal Employer Identification Number (EIN) from the IRS, or your Washington State Unified Business Identifier (UBI) number.
COMMON MISTAKE: Submitting a Social Security Number for a sole proprietorship without an EIN, which Spokane requires for business license verification and can lead to application holds.
List the full name of the person (owner, manager, or authorized agent) who can answer questions from Spokane Planning & Development Services about this application.
COMMON MISTAKE: Listing a generic title like 'Manager' without a specific person's name, which violates Spokane's requirement for a designated responsible party and delays communication.
Specify the contact's role (e.g., 'Owner', 'General Manager', 'Authorized Agent') to establish their authority to represent the business in the permit process.
Provide a direct phone number for the primary contact, in a standard 10-digit format, where they can be reached during business hours for urgent permit inquiries.
COMMON MISTAKE: Entering a non-working, disconnected, or automated phone system number, which can lead to missed requests for additional information and application expiration.
ApronPrep auto-fills 29 of 35 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Submitting a generic sketch instead of a scaled site plan showing exact boundaries, setbacks from doors/curbs, and clear pedestrian pathways leads to immediate rejection. The Spokane Planning Department requires details down to the inch, such as a 6-foot clear pedestrian zone. This mistake adds 1-2 weeks to your timeline as you must re-draft and resubmit plans for review.
Failing to provide a Certificate of Insurance (COI) naming the City of Spokane as an additional insured with a $1,000,000 general liability minimum is a top administrative rejection. Many owners submit their standard policy, which is insufficient. Applications are returned until the correct COI is filed, causing a 1-3 week delay in permit issuance.
Overstating the number of seats based on table count alone without factoring in required square footage per seat (typically 15 sq. ft. per patron for outdoor areas) violates the Spokane Municipal Code. For example, claiming 20 seats for a 200 sq. ft. patio will be flagged. Correcting this requires a revised application and plan review, setting approval back by 1-2 weeks.
ApronPrep auto-fills 29 of 35 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Spokane | ||
| Tacoma |
Gather the required documents: a detailed site plan drawn to scale, a certificate of liability insurance naming the City of Spokane as an additional insured, a signed indemnity agreement, and proof of a valid City of Spokane Business License. The site plan is the most scrutinized item — it must show all existing fixtures, proposed seating layout, pedestrian clearances (a minimum 5-foot unobstructed path), barriers, and dimensions. Applications with incomplete or non-scaled plans are the most common cause for immediate return.
File your completed application packet with the City of Spokane Streets Department. You must submit the original application form, all prepared documents, and the **$150 government filing fee** (as of 2026, per the city fee schedule). Submissions are typically accepted in person at City Hall or by mail. Ensure your insurance certificate explicitly lists the city to avoid rejection — generic certificates are not accepted.
The Streets Department circulates your application for internal review by Planning, Fire, and Police departments. Concurrently, a public notice of your application is posted on-site for a 10-day comment period, as required by Spokane Municipal Code (SMC) 17C.110. This is when adjacent property owners or the public can raise objections. Do not assume silence equals approval; the review period is mandatory regardless.
Applications are handled by your local city of spokane in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Washington.
federal
local
state
federal
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsThe processing timeline varies significantly based on project complexity and city review schedules, typically taking 4 to Views full content for detailed timelineVaries12 weeks from application submission to approval, per the Spokane Planning and Development Services Department. Your timeline will be longer if you haven't already secured related permits, like a Building Permit for structural changes or a Certificate of Occupancy if you are a new tenant. Contact the department directly to confirm the current review queue.
The city government filing fee for this permit is listed as $0–$0, according to the Spokane Planning and Development Services fee schedule. However, note that this refers to the initial permit application fee only; you may incur other mandatory costs for required plan reviews, inspections, and associated permits. Not legal advice — verify total costs with the City of Spokane.
No, this permit is not transferable to a new business location. A Spokane Outdoor Seating/Sidewalk Cafe Permit is issued for a specific address and approved site plan under Spokane Municipal Code 17C.130. If you move your restaurant, you must submit a completely new application, including new site and floor plans, for review at the new address. Contact the Planning Department to begin the new application process.
This permit is typically issued as an annual license. You must renew it each year to maintain your legal authorization to operate outdoor seating, as stipulated by Spokane city regulations. The renewal process involves confirming continued compliance with all original conditions, and you may need to provide updated insurance certificates. Check with Spokane Planning and Development Services for the specific renewal deadline and any updated requirements.
A city inspector will visit your site to verify the outdoor seating area is built exactly as shown on your approved plans. They will check for compliance with key safety and accessibility standards, ensuring the required clear pedestrian path width is maintained (typically a minimum 5-foot unobstructed sidewalk clearance) and that all temporary structures are securely anchored. Passing this final inspection is required before you can legally open your outdoor dining space to the public.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Washington specifically, we have analyzed compliance dossiers for 2 cities (Spokane, Tacoma), generating Rich FILs (Form Intelligence Layers) with 35 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.