Install a sign without this permit, and the City of Spokane can issue daily fines and require its immediate removal, potentially costing you your investment and key visibility. The requirement, issued by the Spokane Planning & Development Services department, is also called a Sign Master Permit and ensures your proposed signage complies with local design and safety codes. Key facts:
Analyzed from Sign Permit
84% from one compliance interview
Manual entry or document upload required
The requirement for a Sign Permit in Spokane is rooted in several legal codes, primarily administered by the City of Spokane's Building Department. This includes the locally adopted and enforced editions of the International Building Code (IBC) and the International Fire Code (IFC), which govern structural safety, wind loads, and fire egress. You must also comply with Spokane Municipal Code (SMC) Title 17 (Zoning), which regulates sign size, location, height, and illumination, and the Washington State Accessibility Code (WSAC), ensuring signs are perceivable to individuals with disabilities. This permit is not a suggestion—it's a mandatory step to ensure public safety and maintain community aesthetics, as defined by these enforceable laws.
Installing a commercial sign without this permit triggers immediate and costly consequences. Enforcement is strict, as the city actively reviews new construction and business openings. The penalties include:
Legal code: State building code (locally administered), local building ordinances, state accessibility code
Recent update: As of 2026, the City of Spokane has fully transitioned its permit review process to a digital platform via the 'MyBuildingPermit' portal, which may impact submittal requirements and review timelines for sign applications.
| Type | Required | Notes |
|---|---|---|
| Restaurant (Full-Service) | Required | Required — any permanent exterior sign on a commercial building requires a permit per Spokane Municipal Code (SMC) § 17C.120.030. |
| Bar / Nightclub | Required | Required — illuminated signs, window signs, and projecting signs are regulated and require a permit under SMC § 17C.120. |
| Food Truck | Not Required | Not required for the vehicle — but any permanent on-site signage at its location (e.g., a menu board) requires a permit. |
| Coffee Shop / Café | Required | Required — for wall signs, window lettering, or freestanding signs, as defined by SMC § 17C.120. |
See which restaurant types need this requirement — and which don't.
See Full Requirements →Enter the exact street address where the sign will be installed, as recorded on the property title.
COMMON MISTAKE: Using an adjacent parcel address or a P.O. Box; this must be the physical parcel location for zoning verification.
Enter the current date in MM/DD/YYYY format when you submit the application.
COMMON MISTAKE: Using a future date or an incorrect format; an inaccurate date can invalidate the submission.
Provide the legal name of the entity or person who owns the property, as listed on the deed.
COMMON MISTAKE: Listing the tenant or business name instead of the property owner; the permit requires owner authorization.
Enter the mailing address for the property owner, where official correspondence can be sent.
COMMON MISTAKE: Repeating the job site address; this should be the owner's separate mailing address.
Provide the full business name of the licensed contractor who will install the sign.
COMMON MISTAKE: Omitting this if you are self-installing; a licensed contractor is required for installation in Spokane.
Enter the primary contact phone number for the contractor, including area code.
COMMON MISTAKE: Providing a disconnected or incorrect number; inspectors need this for scheduling.
Enter the contractor's business mailing address.
Enter the valid Washington State Contractor Registration number for the installing contractor.
COMMON MISTAKE: Providing an expired license number; the license must be active at time of application.
If the sign includes electrical components, provide the Washington State Electrical Contractor license number.
COMMON MISTAKE: Omitting this for illuminated signs; electrical work requires a separate licensed contractor.
Provide the full name of the primary project contact (owner or manager) for permit questions.
ApronPrep auto-fills 81 of 97 fields from a single compliance interview — no re-typing, no guessing what the government expects.
Using the wrong formula to measure the total sign face area is the most frequent error. Applicants often include support structures or base materials in the calculation, which are excluded per the Spokane Municipal Code (SMC) § 17C.110. This miscalculation causes immediate rejection for exceeding the maximum allowable square footage for your zoning district. To avoid this, measure only the background area upon which letters or logos are placed; for double-faced signs, the area of only one face counts.
Failing to provide a detailed, dimensioned site plan showing the exact sign location relative to property lines, buildings, and public rights-of-way is a major cause of delay. The Spokane Planning Services Division requires this to verify setbacks and sight triangle clearances. A plan missing scaled distances or using an unclear sketch adds 2-3 weeks for review as the city will issue an 'incomplete application' notice. Use a recent survey or scaled architectural drawing that clearly marks the proposed sign's location and dimensions.
Applying for prohibited lighting types, like flashing or moving lights, which are not allowed under SMC § 17C.110.710. Describing illumination as 'LED' without specifying it's constant, internal, and non-intermittent often triggers a correction request. This mistake can lead to a denied permit if the proposed lighting violates code, forcing a full re-application. Specify 'internally illuminated cabinet with static white light' or 'non-illuminated' to match approved categories.
ApronPrep auto-fills 81 of 97 fields from one compliance interview.
No credit card required
| City | Fee Range | Timeline |
|---|---|---|
| Seattle | Contact Seattle SDCI for current sign permit fee schedule | 10-20 business days for permit review, varies based on design complexity and SEPA requirements |
| Spokane | ||
| Tacoma | Contact Tacoma Community and Economic Development Department for current sign permit application and inspection fees | 15-30 business days for plan review and approval |
Develop scaled drawings showing the sign's dimensions, colors, materials, illumination details, and exact placement on the building or property. You must also confirm your property's zoning district and have the site's legal address and parcel number ready. The most common rejection reason is incomplete or non-scaled drawings, which stops review immediately. Most applicants spend 1–2 weeks finalizing these documents with their sign vendor or architect.
Complete the official Sign Permit application form and submit it with your prepared plans, a site plan showing the sign location, and proof of property ownership or a notarized authorization from the owner. Applications are submitted in person at the Planning Services counter (808 W Spokane Falls Blvd) or via their online portal if available. Missing the owner authorization form is a top cause of same-day rejection.
A city planner reviews your submission against Spokane Municipal Code (SMC) Title 17 for zoning compliance, including size, height, placement, and illumination standards. For signs in historic districts or with special illumination, additional reviews may be required. This step often involves a request for additional information (RFI); responding slowly adds significant delay. The initial review typically takes 10–15 business days.
Applications are handled by your local building department in each city. Select your city below for authority details, fees, and processing timeline.
This is one of 13 requirements for opening a restaurant in Washington.
federal
local
state
federal
See all co-required forms and how they connect to your compliance dossier.
See All RequirementsProcessing time varies significantly based on the project's scope, staffing at the Spokane Planning & Development Services Department, and the completeness of your application. According to the department's published information, simple applications may be reviewed in a few weeks, while complex designs requiring multiple department reviews can take several months. Always contact the Planning & Development Services Department directly to get the most current timeline estimate for your specific project, as timelines are not guaranteed.
Government filing fees for a sign permit are listed as $0–$0 according to the Spokane fee schedule. However, your project may still incur costs for required plan reviews, professional certifications, or Building Permit fees if structural work is involved. It is critical to confirm any potential costs directly with the Spokane Planning & Development Services Division before submitting, as the final project scope determines applicable fees. Not legal advice — verify with the City of Spokane.
No, sign permits are site-specific and non-transferable. The permit is tied to the approved design, location, and property, as governed by the Spokane Municipal Code (SMC) Title 17. If you relocate your business or install a sign at a new address, you must submit a completely new application, including all site plans and structural details for the new location. This is a common reason for rejection if attempted, so factor this requirement into your planning timeline.
Typically, a sign permit does not require periodic renewal; it is valid for the life of the sign as long as it remains compliant with code and is not materially altered. However, the City of Spokane may require a new permit for any modifications, repairs exceeding a certain threshold, or a change in business ownership. You should also ensure your sign remains compliant with other related requirements, such as your active City Business License/Registration. Contact Planning & Development Services to confirm the status of your specific permit.
A city inspector from the Planning & Development Services Division will visit your site to verify the sign is installed exactly as shown on the approved plans. They will check for compliance with the Spokane Municipal Code regarding size, height, setback, illumination, structural safety, and attachment to the building. If the sign fails inspection due to a deviation from the plans, you must correct the issue and schedule a re-inspection, which can delay your project opening by weeks.
This guide is generated from ApronPrep's compliance dossier system, which uses 53 parallel AI authority experts to discover requirements, then downloads actual forms and generates field-level intelligence for each one.
For Washington specifically, we have analyzed compliance dossiers for 3 cities (Seattle, Spokane, Tacoma), generating Rich FILs (Form Intelligence Layers) with 97 form fields analyzed for this requirement. Fee data is sourced from actual county department fee schedules, not estimates.
Our data is verified against official government sources and updated when regulatory changes are detected. If you find an error, please report it — accuracy is our core commitment.
ApronPrep discovers every permit your city requires — including the ones generic checklists miss. Pick your city for the complete package.